- This page, Board of State Examiners of Plumbers and Gas Fitters Meeting - 10.7.26, is offered by
- Division of Occupational Licensure
- Board of State Examiners of Plumbers and Gas Fitters
Public Meeting Notice Board of State Examiners of Plumbers and Gas Fitters Meeting - 10.7.26
Overview
This is a remote meeting. You can participate from your computer, laptop, or smartphone. See the Meeting Agenda for details.
You will need
Microsoft Teams meeting link and phone number
Join: Join Meeting
Meeting ID: 232 444 145 992 639
Passcode: aM7NK95X
Dial in by phone
+1 857-327-9245,,729181744# United States, Boston
Phone conference ID: 729 181 744#
Meeting Minutes
In accordance with the provisions of G.L. c. 30A § 20, the Board of State Examiners of Plumbers and Gas Fitters convened a regular monthly meeting:
Microsoft Teams Meeting Wednesday, October 7, 2026 at 9:00 am
The topics shown below were discussed at the aforementioned meeting. At 9:04 am, Chair Joseph McNamee called the open meeting to order.
Informational note: All votes were taken by roll call. Where each member voted in favor, the vote will be reported as unanimous.
Board members present:
- Mr. Joseph McNamee, Chairman, Master Gas Fitter
- Mr. Harold Knight, Vice-Chairman, Journeyman Plumber
- Mr. John Cruz, Member, LP Installer
- Mr. Bahig A. Kaldas, P.E., Member, plumbing Engineer
- Mr. Wayne Thomas, Member, Journeyman Gas Fitter
- Ms. Katharine Daigle, DPH Designee
- Ms. Sarah Badway, Public Member
- Mr. Dan Kilburn, Member, DOL Designee
- Ms. Kimberly Garside, Member, Master Plumber
Board members absent:
DOL staff present:
- Mr. Michael Auerbach, Board Executive Director
- Mr. Michael Guida, State Board Code and Technical Coordinator
- Ms. Caitlyn Berry, Licensing Coordinator
- Mr. Charles Kilb, Board Legal Counsel
- Mr. Scott Padden, State Plumbing and Gas Inspector
- Mr. James O’Reilly, State Plumbing and Gas Inspector
- Mr. Mark Zade, State Plumbing and Gas Inspector
Approval of Previous Meeting Minutes
- September 2, 2026 Executive Session
- Motion: JC moved to approve; DK seconded
- Vote Result: Adopted unanimously (KD abstained)
- September 2, 2026 Public Board Meeting Minutes
- Motion: JC moved to approve, DK seconded.
- Vote Result: Adopted unanimously (KD abstained)
- Executive Director Report: Michael Auerbach, Executive Director
- From September 2-October 1, 2026, staff reviewed and accepted 4,603 Products.
- Staff reviewed and approved the following licenses during that period:
- 7 Gas Fitter Apprentice
- 2 Gas Fitter Master
- 2 Plumbing/Gas Fitter Inspector
- 72 Plumbing Apprentice
- 6 Plumbing Corporation/Professional Corporation
- 51 Plumbing Journeyman
- 12 Plumbing LLC
- 23 Plumbing Master
Legal Report – Charles Kilb, Board Counsel
CK – Nothing to report
Discussion
- Plumbing Board Code Subcommittee update.
- Next meeting is October 27 in hybrid fashion (in-person portion to take place at 1 Federal Street, 6th floor, Boston; anyone may still participate remotely).
- MG noted that members can contact staff for agenda items for the Subcommittee meeting to be added.
- Board Gas Code Subcommittee: MG added that dates for the Gas Code Subcommittee meeting will be announced in the near future.
Product Matters
- Chris May and Pat Shea from American Gas Safety presented information and answered questions regarding concerns with the Merlin CT1500S system and its installation in Barnstable. This was posted as a possible rescission of product acceptance. There was a short video presentation and discussion on the sensor’s alarm settings, which appeared to show a failure. The Board had some concerns about the differences in test outcomes and needed more information. The manufacturer and a representative of the school where the system installed indicated that they believed the system would function properly and that they had no concerns. CK recommended, based on the lack of complete information and that the manufacturer and user are both on notice and taking responsibility for safety concerns, that the Board take no action as the inspector and the manufacturer work together to generate that information. No formal action taken.
- Ken Reagan, Glenn Gibbons and Jim Fitzgerald from Cannistraro Plumbing sought an alternative Test Site approval at 300 Longwood Ave Boston to install McGuire Press P-Traps. Due to project delays at Logan Airport (the original test site) that prevented timely installation, the new proposed test site would be at Boston Children’s Hospital.
- Motion: HK moved that the Board approve five test sites for a period of six months (with building owner reporting after that period) under the same stipulations as the previously approved test site. JC seconded.
- Vote Result: Approved unanimously.
Vocational School Projects
- 26-VSP-357012- Montachusett Regional VTHS- 2 Raymond Pl, Royalston. Instructor Kevin Martin sought the Board’s approval for a commercial vocational project that is not on school property.
- Motion: HK moved to approve. JC seconded.
- Vote Result: Approved unanimously.
Variances
26-GV-356666- Ken Regan, 600 Terminal Rd East Boston.
- The petitioner sought relief from 248 CMR 3.04(1), Products, Design, and Standards, to allow the installation of a thermally activated shutoff valve to be installed on the gas main. As this is a state project, Board of Health notification is not required. State Inspector O'Reilly has been notified. This is a Post Installation Variance. Mr. Glenn Gibbons of Cannistraro presented a brief overview of the project. CK asked why the applicant to explain to the Board why its approval is necessary and what the hardship is. The applicant indicated that they had no hardship but were attempting to follow old guidelines set by the Department of Public Utilities from 1974. CK indicated that the Code section on post-installation variance requires that a hardship must be established. In light of there being no hardship indicated, the Board cannot approve the variance. He indicated that the Board could choose to take no action rather than deny the variance to allow the applicant to review code compliance with the inspector. Mr. O’Reilly indicated he had no opposition to the Board taking no action.
- Motion: HK moved to take no action. DK seconded.
- Vote Result: Approved unanimously.
- 26-GV-356688- Timothy Begin, 600 Terminal Rd East Boston.
- The petitioner sought relief from 248 CMR 3.04(1), Products, Design, and Standards, to allow the installation of a gas booster that is not currently listed on the Board's accepted products list. As this is a state project, Board of Health notification is not required. State Inspector O'Reilly has been notified. Mr. Begin presented the project and issue that warrants a variance, which was that no acceptable booster was available.
- Motion: JC moved to allow for the device to be installed, provided that the petitioner provide regular test results under standard Board requirements. HK seconded.
- Vote Result: Approved unanimously.
- 26-PV-357118- Al Michaud, 111 Coolidge St, Sherborn.
- The petitioner sought relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, not to install the required plumbing fixtures during construction of a new riding arena and bathroom facilities. The petitioner proposed utilizing temporary restroom trailers to serve the existing riding arena for a six-month period. The Board of Health and the local inspector have been notified. Mr. Michaud provided a brief presentation of the project and the need for relief. Chris Cannery, Sherborn Building Commissioner, voiced his approval. Cheryl Beardsley of the Sherborn Board of Health noted that there are concerns about compliance with their sewer regulations. CK reminded the Board that the focus was on 248 CMR, not local regulations – he noted that the Board of Health has its own authority if the matter is not being resolved to its satisfaction.
- Motion: HK moved that the Board approve a 2-year variance. DK seconded.
- Vote Result: Approved unanimously (KD abstained)
- 26-PV-357216- Angelo Pistoftzian, 118 Concord Ave, Belmont.
- The petitioner sought relief from 248 CMR 10.09 Interceptors, Separators, and Holding Tanks not to install the required separation system for a 300 square foot single bay garage. The Board of Health and the local inspector have been notified. Paul Morales of Thermoil presented Mr. Pistoftzian’s need for a variance, which is that the installers are not allowed to penetrate the floor. Members noted that they have never allowed this type of variance.
- Motion: HK moved to deny. JC seconded.
- Vote Result: Motion to deny approved unanimously.
- 26-PV-357287- Gregory Walsh, 695 Belmont St, Belmont.
- The petitioner sought relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, not to install the required shower, mop sink and drinking water station for a 780 square foot fitness establishment. The Board of Health and the local inspector have been notified. Petitioner was not able to present.
- Motion: HK moved to table. JC seconded.
- Vote Result: Approved unanimously.
- Mr. Walsh was able to join and the Chair reopened the agenda item. Mr. Walsh presented his proposal.
- Motion: HK moved to approve the variance as long as the petitioner installs a utility sink and not a mop sink. JC seconded.
- Discussion: Mr. Walsh said that the owner is willing to provide a free-standing water station. HK amended his motion to omit the shower, permit the service-style sink and include the water dispenser.
- Vote Result: Approved unanimously.
- 26-PV-357220- Robert Ceppi, 203 Circuit Ave, West Springfield.
- The petitioner is seeking relief from 248 CMR 10.09 Interceptors, Separators, and Holding Tanks not to install the required separation system for a vehicle storage facility. The Board of Health and the local inspector have been notified. Mr. Ceppi (33625-EN-FP) and Bob Kushner of West Springfield provided an overview of the proposal. Jay Steup, West Springfield Building Commissioner, noted that a 2015 variance proposal presented in 2015 was denied by this Board. Members noted that they have never allowed this type of variance.
- Motion: JC moved to deny. DK seconded.
- Vote Result: Motion to deny approved unanimously.
- 26-PV-357477- Nathan Gould, 1305 Columbia Rd, Boston.
- The petitioner sought relief from 248 CMR 10.05(15), Sewerage Disposal Connection, to allow the building drain to discharge into the treatment facility's effluent channel rather than providing an independent sewerage connection. As this is a pretreatment sewerage facility, the applicant proposes connecting the building drain directly to the treatment process. The petitioner also sought relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, to install a single mop sink in the building in lieu of providing a mop sink on each level. As this is a state project, Board of Health notification is not required. State Inspector Padden has been notified. Mr. Gould presented an overview of the proposal.
- Motion: HK moved to approve. WT seconded.
- Vote Result: Approved unanimously.
- 26-PV-357478- Nathan Gould, 47 Ward St, Boston.
- The petitioner sought relief from 248 CMR 10.05(15), Sewerage Disposal Connection, to allow the building drain to discharge into the treatment facility's effluent channel rather than providing an independent sewerage connection. As this is a pretreatment sewerage facility, the applicant proposed connecting the building drain directly to the treatment process. The petitioner also sought relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, to install a single mop sink in the building in lieu of providing a mop sink on each level. As this is a state project, Board of Health notification is not required. State Inspector Padden has been notified.
- Motion: WT moved to approve. HK seconded.
- Vote Result: Approved unanimously.
- 26-PV-357486- Aldolfo Perez, 100 Bellingham Rd, Brookline.
- The petitioner sought relief from 248 CMR 10.06, Materials, to use PVC piping for a roof drain within a commercial building. The petitioner also sought relief from 248 CMR 10.14(7)(k) water Recycling / Re-Use Prohibited to collect rainwater to be used for a special purpose pool. The Board of Health and the local inspector have been notified. Mr. Perez presented the variance proposal for a religious ritual bathing pool (mikvah) at a Jewish Life Center in Brookline. KD expressed concern that the local Board of Health would need to provide input.
- Motion: WT moved to approve the variance provided that the petitioner receives approval from the local Board of Health. HK seconded.
- Vote Result: Approved unanimously.
Board Delegated Staff Approvals
None
Board-delegated staff approvals – Board vote not required.
None
Delegated vocational school project approvals
None
Board will consider any matters not reasonably anticipated by the Chair
None – The Chair then indicated the remaining parts of the meeting would be in closed session.
Quasi-Judicial Session (Disciplinary decisions - Closed per M.G.L c. 30A, §18)
None
Executive Session
The Chair called for the Board to enter Executive Session per M.G.L. c. 30A, s. 21 to discuss applicants’ character rather than competence.
Motion: JC moved to go into Executive Session; WT seconded.
Vote Result: Approved unanimously. The meeting went into Executive Session at 11:20.
Separate minutes were created for Executive Session
Upon conclusion of the Executive Session, a motion was made by JC to adjourn, DK seconded.
Items Relied Upon during the Open Meeting
- Agenda
- Draft minutes
- Product information
- Variance Applications
Agenda
In accordance with the provisions of G.L. c. 30A § 20, notice is hereby given that the Board of State Examiners of Plumbers and Gas Fitters will be convening their monthly meeting.
- 09:00 a.m. Open Meeting Called to Order
- Note Meeting Recording
- Roll Call by Chair for Quorum
| Members | Appointment |
|---|---|
| Mr. JosephMcNamee | Chairman, MasterGas Fitter |
| Mr. HaroldKnight | Vice-Chairman Journeyman Plumber |
| Mr. John Cruz | Member, LP Installer |
| Mr. Bahig A. Kaldas,P. E. | Member, Plumbing Engineer |
| Mr. WayneThomas | Member Journeyman Gasfitter |
| Ms. Katharine Dagle | Member, Dept.of Public Health |
| Ms. SarahBadway | Public Member |
| Mr. DanKilburn | Member, DOL Designee |
| Mrs. Kimberly Garside | Member, Master Plumber |
| STAFF | Position |
| Mr. CharlesKilb | Board LegalCounsel |
| Mr. Michael Auerbach | Executive Director |
| Mr. Michael Guida | Board Code & Technical Coordinator |
| Ms. Caitlyn Berry | Board Staff |
| Ms. Carrie Matheson | Board Staff |
| Mr. Scott Padden | State Plumbing & Gas Inspector |
| Mr. James O’Reilly | State Plumbing & Gas Inspector |
| Mr. Marc Zade | State Plumbing & Gas Inspector |
- Approval of Meeting Minutes
- September 2, 2026, Regular Session
- September 2, 2026, Executive Session
- Executive Director Report – Michael Auerbach
- Staff reviewed and accepted 4,603 Products.
- 7 Gas Fitter Apprentice
- 2 Gas Fitter Master
- 2 Plumbing/Gas Fitter Inspector
- 72 Plumbing Apprentice
- 6 Plumbing Corporation/Professional Corporation
- 51 Plumbing Journeyman
- 12 Plumbing LLC
- 23 Plumbing Master
- Legal / Board Counsel Report – Charles Kilb
- Discussion
- Plumbing Board Code Sub-committee update.
- Gas Board Code Sub-committee.
- Product Matters
- Chris May from American Gas Safety will present information and answer questions regarding concerns with the Merlin CT1500S system. Possible rescission of product acceptance.
- Ken Reagan from Cannistraro Plumbing is seeking an alternative Test Site approval at 300 Longwood Ave Boston to install McGuire Press P-Traps.
- Vocational School Projects
- 26-VSP-357012- Montachusett Regional VTHS- 2 Raymond Pl, Royalston. Instructor kevin Martin is seeking the Boards approval for a commercial vocational project that is not on school property.
- Variances
- 26-GV-356666- Ken Regan, 600 Terminal Rd East Boston. The petitioner is seeking relief from 248 CMR 3.04(1), Products, Design, and Standards, to allow the installation of a thermally activated shutoff valve to be installed on the gas main. As this is a state project, Board of Health notification is not required. State Inspector O'Reilly has been notified. This is a Post Installation Variance
- 26-GV-356688- Timothy Begin, 600 Terminal Rd East Boston. - The petitioner is seeking relief from 248 CMR 3.04(1), Products, Design, and Standards, to allow the installation of a gas booster that is not currently listed on the Board's accepted products list. As this is a state project, Board of Health notification is not required. State Inspector O'Reilly has been notified.
- 26-PV-357118- Al Michaud, 111 Coolidge St, Sherborn. The petitioner is seeking relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, not to install the required plumbing fixtures during construction of a new riding arena and bathroom facilities. The petitioner proposes utilizing temporary restroom trailers to serve the existing riding arena for a six-month period. The Board of Health and the local inspector have been notified.
- 26-PV-357216- Angelo Pistoftzian, 118 Concord Ave, Belmont. The petitioner is seeking relief from 248 CMR 10.09 Interceptors, Separators, and Holding Tanks not to install the required separation system for a 300 square foot single bay garage. The Board of Health and the local inspector have been notified.
- 26-PV-357287- Gregory Walsh, 695 Belmont St, Belmont. The petitioner is seeking relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, not to install the required shower, mop sink and drinking water station for a 780 square foot fitness establishment. The Board of Health and the local inspector have been notified
- 26-PV-357220-Robert Ceppi, 203 Circuit Ave, West Springfield. The petitioner is seeking relief from 248 CMR 10.09 Interceptors, Separators, and Holding Tanks not to install the required separation system for a vehicle storage facility. The Board of Health and the local inspector have been notified.
26-PV-357477- Nathan Gould, 1305 Columbia Rd, Boston. The petitioner seeks relief from 248 CMR 10.05(15), Sewerage Disposal Connection, to allow the building drain to discharge into the treatment facility's effluent channel rather than providing an independent sewerage connection. As this is a pretreatment sewerage facility, the applicant proposes connecting the building drain directly to the treatment process. The petitioner also seeks relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, to install a single mop sink in the building in lieu of providing a mop sink on each level.
As this is a state project, Board of Health notification is not required. State Inspector Padden has been notified
26-PV-357478- Nathan Gould, 47 Ward St, Boston - The petitioner seeks relief from 248 CMR 10.05(15), Sewerage Disposal Connection, to allow the building drain to discharge into the treatment facility's effluent channel rather than providing an independent sewerage connection. As this is a pretreatment sewerage facility, the applicant proposes connecting the building drain directly to the treatment process. The petitioner also seeks relief from 248 CMR 10.10(15), Table 1, Minimum Facilities, to install a single mop sink in the building in lieu of providing a mop sink on each level.
As this is a state project, Board of Health notification is not required. State Inspector Padden has been notified.
- 26-PV-357486- Aldolfo Perez, 100 Bellingham Rd, Brookline. The petitioner seeks relief from 248 CMR 10.06, Materials, to use PVC piping for a roof drain within a commercial building. The petitioner seeks relief from 248 CMR 10.14(7)(k) water Recycling / Re-Use Prohibited to collect rainwater to be used for a special purpose pool. The Board of Health and the local inspector have been notified.
- Board Delegated Staff Approvals – Special Permission – None
- Board Delegated Staff Approvals (FYI) – Board Vote Not required.
26-DAPV-356971- Daniel McIntyre - 9 Allenclair Dr, Amesbury.
Pump/Substation variance.
26-DAPV-357087- Daniel McIntyre- 191 Water St, Hanover.
Pump/Substation variance.
- 26-DAPV-357089- Daniel McIntyre- 130 Wyllis Ave, Everett. Pump/Substation variance.
- 26-DAPV-357252- Daniel McIntyre- 39 East Brookfield Rd, North Brookfield. Pump/Substation variance
Delegated Vocational School Project Approvals – None
- 26-VSP-357357- South Middlesex Regional School District- Residential Vocational application, 93 Parmenter Rd, Framingham
- Items not reasonably anticipated by the Chair
- Quasi-Judicial Session - Disciplinary decisions - Closed per M.G.L c. 30A, §18
- Executive Session – Character Reviews
- K.M.
- Z.H.
- Investigative Conference - Closed per M.G.L. c. 112, § 65C
- None
Adjournment: Next monthly board meeting is October 7, 2026
Note: If you need a reasonable accommodation to participate in the meeting, please reach out to Cheryl Yebba at 617- 701-8711. The Agency will make best efforts to accommodate requests received in a timely manner.