MassDEP Stage I Vapor Recovery Program

Stage I vapor recovery systems prevent gasoline fumes from escaping into the air during fuel deliveries to service stations and fueling of vehicles.

Table of Contents

News & Updates

December  2022
   
MassDEP adopted revisions to 310 CMR 7.24(3): Distribution  of Motor Vehicle Fuel effective December 23, 2022.  These revisions pertain only to updates to the list of California Air Resources Board (CARB) Stage I enhanced vapor recovery (EVR) systems and components approved for installation in Massachusetts. See the list in Tables 1&2 at 310 CMR 7.24(3)c.(1).

•    310 CMR 7.24(3): Adopted Stage I Enhanced Vapor Recovery Amendments

July 2022

MassDEP reminded Stage I facilities that to dispense gasoline and/or gasoline/alcohol fuel blends they are required to:

  • Install on or before January 2, 2023 Stage I enhanced vapor recovery (EVR) equipment approved by the California Air Resources Board (CARB), and
  • Replace pre-EVR "slip-on" spill buckets with EVR spill buckets if the pre-EVR "slip-on" buckets need to be repaired or replaced after January 2, 2023.

These facilities should schedule all necessary upgrade and testing work as soon as possible. See the regulations at 310 CMR 7.24(3) for details.

The EVR upgrade requirement does not apply to equipment that dispenses diesel, heating oil, or other low-volatility fuels.

Additional Resources   for News & Updates

MassDEP Regulations & Policies

MassDEP most recently amended 310 CMR 7.24(3): Stage I Vapor Recovery regulation in December 2022. See Additional Resources below for:

  • The final amendments (showing changes from the public comment draft), and
  • A fact sheet summarizing the amendments, including what changed and what remained the same.

Note: Only Stage I (Phase I) vapor recovery systems approved by the California Air Resources Board (CARB) are allowable in Massachusetts.

Additional Resources   for MassDEP Regulations & Policies

Stage I System Installation, Certification & Closure

See Key Actions below for all Stage I forms, including those for system installation and modification; annual in-use certification; change in owner, lessee, operator or controller; system closure; and testing company documentation.

To learn more about annual in-use certifications, see Additional Resources below for a Fact Sheet and a listing of individual facilities' due dates.

Key Actions   for Stage I System Installation, Certification & Closure

Additional Resources   for Stage I System Installation, Certification & Closure

Stage I Guidance & Checklists

See Additional Resources below for guidance to follow and a checklist to use when performing weekly compliance inspections of Stage I vapor recovery systems.

A list of Stage I testing companies operating in Massachusetts is available here.

Additional Resources   for Stage I Guidance & Checklists

Stage I Testing Companies

The Massachusetts Department of Environmental Protection does not certify Stage I testing companies. Inclusion on this list does not imply endorsement of any company by MassDEP or the Commonwealth of Massachusetts. Last updated in February 2022.

Stage I Testing Companies
Advanced Tank Testing
P.O. Box 385
South Deerfield, MA 01373
(413) 665-8300
Dependable Petroleum Service
1 Roberts Road
Plymouth, MA 02362
(800) 322-0360

NEXTEST
2220 Plainfield Pike, Suite 202
Cranston, RI 02921
(800) 858-9128

Biermann Services Inc.
77 Fuller Road
Chicopee, MA 01020
(413) 592-7725
ELO2 Inc.
48 Plainfield Pike
Foster, RI 02825
(508) 381-0745
P.M. Environmental Inc.
P.O. Box 1282
Marshfield, MA 02050
(978) 526-8255
CCMI
25 West State Street
Granby, MA 01033
(413) 467-1124
Fletchers Inspection & Service
84 Emerson St.
Fall River, MA 02720
(857) 891-4931
Petroleum Equipment Service (Wildco)
1376 West Central Street #110
Franklin, MA 02038
(866) 244-4724
Commtank, Inc.
84 New Salem Street
Wakefield, MA  01880
(617) 628-8260
FRC Compliance Services LLC
41 Pierce Road
Rockland, MA 02370
(781) 424-4589
Roy Petroleum LLC
P.O. Box 738
Goffstown, NH 03045
(413) 627-2577
Compliance Solutions Inc.
P.O. Box 431
Rochdale, MA 01542
(508) 509-8971
Gaftek LLC
155 Memorial Drive
Building 4, Unit D
Shrewsbury, MA 01545
(888) 485-5731
Tanknology
520 Fellowship Road #A-110
Mt. Laurel, NJ 08054
(800) 666-1215
Compliance Testing Services
P.O. Box 715
N. Dighton, MA  02764
(774) 872-5151

Lemelin Environmental Services, Inc.
70 North Chicopee Street
Chicopee, MA 01020
(413) 598-8555

Valley Tank Testing
451 Apollo Beach Boulevard
Apollo Beach, FL 33572
(813) 671-9065

Crompco LLC
1815 Gallagher Road
Plymouth Meeting, PA 19462
(800) 646-3161
Mass Tank Inspection Services LLC
29 Abbey Lane
Middleboro, MA 02346(508) 923-3445
 

Stage II System Decommissioning

MassDEP promulgated regulations in 2015 that required the decommissioning of all Stage II systems and specific enhancements to all Stage I systems by January 2, 2017.

See Key Actions below for related forms and Additional Resources below for an FAQ about the Stage II decommissioning requirement.

Key Actions   for Stage II System Decommissioning

Additional Resources   for Stage II System Decommissioning

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback