WP68: Treatment Works Plan Approval for New/Modified Facility associated with Groundwater Discharge Non-Industrial or Reclaimed Water Use Permits

Use this permit for any major change to a treatment facility which does not require a change to the permit issued to the facility.

Treatment Works Plan Approval Contacts

EEA ePLACE Help Desk

Phone

Open M-F 7:30 am-5:00 pm, with the exception of all Commonwealth & Federally observed holidays.

The Details   of WP68: Treatment Works Plan Approval for New/Modified Facility associated with Groundwater Discharge Non-Industrial or Reclaimed Water Use Permits

What you need   for WP68: Treatment Works Plan Approval for New/Modified Facility associated with Groundwater Discharge Non-Industrial or Reclaimed Water Use Permits

This plan approval serves to protect the public health, welfare and the environment through the control of pollutant discharges to groundwater or surface water or the use of reclaimed water. It is required for any major physical modification to a treatment works which does not require a modification to the permit issued to the facility. Only those treatment works that have a non-industrial discharge may apply for this plan approval. Groundwater discharge permitted facilities are permitted according to 314 CMR 5.00.

If you have a treatment works meeting one of these criteria:

  • an active, existing ground water or reclaimed water permit whose treatment works produces a non-industrial groundwater discharge (314 CMR 5.00)
  • reclaimed water (314 CMR 20.00)

you may use this category to modify the treatment works, provided no modifications to the existing permit are required.

Non-industrial discharges are those discharges not described in 310 CMR 4.10(5). Sanitary discharges are almost always considered non-industrial.

Fees   for WP68: Treatment Works Plan Approval for New/Modified Facility associated with Groundwater Discharge Non-Industrial or Reclaimed Water Use Permits

How to apply   WP68: Treatment Works Plan Approval for New/Modified Facility associated with Groundwater Discharge Non-Industrial or Reclaimed Water Use Permits

 

File online via the EEA ePlace Portal. See details below.

Next steps   for WP68: Treatment Works Plan Approval for New/Modified Facility associated with Groundwater Discharge Non-Industrial or Reclaimed Water Use Permits

  1. Review the Instructions

  2. Complete the Application Form and Certification Statement

    Please fill out and save the Microsoft Word or Acrobat Adobe PDF form on your computer.

    Important Note: Even when applying online, you will still need to complete a conventional Application Form and upload it as an attachment during the online filing process. Please do not mail in these forms.

  3. Claim your Authorization

    If you have an existing permit with the program not already linked to the EEA ePLACE Portal, you will first need to do one important step: Claim Your Authorization. This process will allow us to link your amendment application to your existing permit and confirm your identity. Once the program staff has reviewed and completed your claim request you will then be able to continue with your amendment application. Please note: You will not be required to upload anything in the Documents section.

  4. Submit your Application and Fee Payment

    1. File online via the EEA ePlace Portal.
    2. You will have the option to pay online by credit card or automated clearing house (ACH) or pay by mail. If you select the pay-by-mail option, instructions on how to do so will be provided when you submit your online application.

     

Contact   for WP68: Treatment Works Plan Approval for New/Modified Facility associated with Groundwater Discharge Non-Industrial or Reclaimed Water Use Permits

Phone

Open M-F 7:30 am-5:00 pm, with the exception of all Commonwealth & Federally observed holidays.

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback