About the Route 114 corridor improvements – North Andover project

More details about the project's design development and public process.

Design background

MassDOT developed the project design in partnership with the Town of North Andover and public stakeholders. Project goals include improvements that address the following areas:

  • Intersection and corridor safety
  • Deficient pedestrian safety and bicycle accommodations
  • Traffic Congestion

Design features

The project includes a range of design improvements intended to make Route 114 safer, more accessible, and more efficient for all users:

  • A more consistent roadway layout including five travel lanes in key areas.
  • Raised medians and controlled access at select locations to help reduce crashes and organize turns at intersections.
  • New sidewalks, crosswalks, and an ADA-compliant pedestrian corridor to improve walking access to neighborhoods and businesses along Route 114.
  • Designated bicycle lanes on several connecting roadways and a shared-use path along the corridor.
  • Bus pull-outs, accessible bus stops, and safer pedestrian crossings near transit areas, coordinated with the Merrimack Valley Transit (MeVa).
  • The installation of one new traffic signal at the Turnpike Street and Hillside Road intersection, and the replacement of eight existing traffic signals within the corridor.

Project development and public process

The Route 114 Corridor Improvements project is the result of years of planning, coordination, and design.

The effort began with the 2010 MVPC Route 114 Corridor Study, which identified the need for improvements along the corridor.

In 2016, MassDOT formally initiated the project, and in 2017–2018, the agency began coordinating with the Town of North Andover to further develop the project.

The project then advanced through key design milestones, including the 25% design submission and public hearing in 2020–2021, followed by the 75% design submission, environmental permitting, and right-of-way activities in 2022–2023.

ActivityTimeframe
2010 Corridor Study2010
2014 Road Safety Audit (RSA), Peters Street to Willow Street2014
2018 RSA (Waverly Road)6/5/18
Public Information Meeting #112/10/2018
Public Information Meeting #204/11/2019
North Andover Select Board Meeting03/08/2021
2021 RSA, Willow Street to Mill Road11/18/21
North Andover Planning Board Meeting05/18/2021
25% Design Public Hearing10/28/2021
Public Information Meeting for Environmental Notification Form (ENF)03/23/2023
Expanded ENF Filed07/17/2023
Public Meeting #412/07/2023
MEPA Consultation Session08/08/2023
Environmental permitting and Right of Way2022 - 2023
Contract Award to J.H. Lynch & Sons, Inc. (Construction)2026