Updates
Project updates will be posted on the following webpage: belairdamremoval.com
Background
In 2019, The Massachusetts Department of Conservation and Recreation (MassDCR) engaged AECOM to conduct a visual structural and geotechnical condition assessment of Bel Air Dam. As part of this work, DCR and AECOM began engagement with the City of Pittsfield to gather background information and discuss the project goals. The results of the 2019 study found that the dam was UNSAFE and STRUCTURALLY DEFICIENT. The Bel Air Dam (MA01061) Phase II Investigation and Alternatives Analysis Evaluation Report (AECOM, February 2020) presented the results of this assessment and used the findings to develop preliminary alternatives to address the deficiencies and to develop an opinion of probable construction costs. The preliminary alternatives considered repair, full removal, and partial removal of the dam consistent with the Dam Safety Regulations. The 2020 analysis estimated that approximately 50,000 CY of sediment was impounded behind the dam and up to 40,000 CY of sediment might need to be removed and disposed/reused if the dam was fully removed. Sediment removal and management costs are the biggest cost factor for the dam removal alternative. The least expensive alternative identified was the dam repair, with only limited sediment removal necessary to access the dam for required repairs. However, this alternative would result in potentially contaminated material remaining in place within the impoundment upstream of the dam.
Cost Estimate
The cost estimate for dam removal, including sediment management and disposal, is approximately $19 million, in 2023 dollars.. without escalation. Dam repair with limited sediment removal that would leave contaminated sediments in place is estimated at approximately $14.5 million in 2023 dollars without escalation. Dam repair with sediment removal equivalent to the dam removal alternative has been estimated at approximately $14.5 million in 2023 dollars without escalation.
Additional Resources
Additional Resources
-
Open PDF file, 605.94 KB, Bel Air Dam Project Summary October 2024 (English, PDF 605.94 KB)
-
Open PDF file, 4.83 MB, Bel Air Dam Project Meeting Presentation 2024-10-23 (English, PDF 4.83 MB)