This information page is intended to serve as a collection of instructions and procedures to be followed by all Cement Concrete Producers who intend on supplying cement concrete to MassDOT projects during the 2027 cement concrete mix design prequalification cycle. Submittals will be reviewed for prequalification by the MassDOT Research and Materials Section (RMS) in the order that they are received. MassDOT prequalification is subject to conformance to MassDOT standard specifications, special provisions, and engineering directives. 

1.0 General Information

2027 Prequalification Submission and Approval Periods

CycleDate Range
2027 Submission Cycle November 1 to December 31, 2026 
2027 Prequalification Cycle Date of Prequalification to April 1, 2028 

Department Contact Email Addresses 

Email ContactEmail Address 
All inquiries related to the MassDOT concrete prequalification program MassDOTConcrete@dot.state.ma.us 
District Materials Engineers2027 Concrete Producer SharePoint Site 

2.0 Specifications, Special Provisions, and Engineering Directives

See Quick Links for the Department’s published specifications, special provisions, and engineering directives. Division II Construction Standard Specifications for Concrete Related Items are referenced in the following table. 

Section Description 
160 Controlled Low-Strength Materials 
201 Basins, Manholes, and Inlets 
230 Culverts, Storm Drains, and Sewer Pipes 
280 Waterways 
301 Water Systems 
430 Cement Concrete Base Course 
476 Cement Concrete Pavement 
485 Granite Rubble Block Pavement 
501 Curb, Curb Inlets, Curb Corners, and Edging 
628 Impact Attenuators 
629 Concrete Barrier 
644 Chain Link Fences and Gates 
685 Stone Masonry Wall 
690 Walls Removed and Rebuilt 
701 Cement Concrete Sidewalks, Pedestrian Curb Ramps, and Driveways 
901 Cement Concrete 
902 Ultra-High Performance Concrete 
940 Driven Piles 
945 Drilled Shafts 
970 Damp-Proofing 
972 Strip Steal Bridge Joint System 
983 Revetment 
996 Noise Barrier Structure 

Division III Materials, Section M4 Concrete and Related Materials are referenced in the following table. Please note that the section numbers and description are based on the future January 2027 edition of the MassDOT Standard Specifications. 

Section Description 
M4.01.0 Constituent Materials and Mix Design Formulations of Cement Concrete 
M4.02.0 Concrete Produced by Stationary and Truck Mixers 
M4.03.0 Concrete Produced by Volumetric Mixers 
M4.04.0 Prepackaged Concrete, Grout, and Mortar Products 
M4.05.0 Masonry, Surfacing, and Erosion Control Units 
M4.06.0 Cement Concrete 
M4.07.0 Elastomeric Concrete 
M4.08.0 Controlled Low-Strength Materials 
M4.09.0 Precast, Prestressed, and Prefabricated Concrete Products 
M4.10.0 Epoxy Resin Adhesive Products 
M4.11.0 Evaporation Reducing Materials 
M4.12.0 Curing Materials 
M4.13.0 Protective Sealing Compounds 

3.0 Preliminary Submittals

All prequalification documentation shall be submitted to the MassDOT Research and Materials Section (RMS) electronically through the "2027 MassDOT Cement Concrete Producer SharePoint Site: 

Upon submission of preliminary submittals, the Producer shall notify the following email address to conduct a review: 

Without email notification, we will be unable to receive your request for review, which may result in delays in the review process for your submission. 

List of Preliminary Submittals 

Submittal Required For Obtained From 
RMS 043 Concrete Mix Design Sheet (.xlsm) All Concrete Producers SharePoint Forms Library 
Aggregate Source License (.pdf) Ready Mix, Volumetric Mix, and Portable Mix Concrete Producers Email 
Petrographic Examination [1] All Concrete Producers Independent laboratory 
Alkali Silica Reaction Test Results (.pdf) [2] All Concrete Producers Independent laboratory 
Aggregate Properties Test Results (.pdf) All Concrete Producers Producer QC or independent laboratory 
Mill Certifications for Cementitious Materials (.pdf) [3] All Concrete Producers Cementitious materials manufacturers 
Environmental Product Declarations (.pdf) All Concrete Producers See EPD guidance below 
Persons of Contact Form (Microsoft Web Form) All Concrete Producers SharePoint Forms Library 
Quality System Manual (.pdf) Volumetric Mix Concrete Producers [4] Producer QC in accordance with M4 
Standard Shop Drawing Checklist (.xlsm) Precast Concrete Producers SharePoint Forms Library 
Standard Shop Drawings (.pdf) Precast Concrete Producers Producer QC in accordance with M4 
Plant Certification Precast and Prestressed Concrete Producers Certifying body in accordance with M4 
Quality Control Personnel Certifications Precast and Prestressed Concrete Producers Certifying body in accordance with M4 
  1. Required for aggregate with suspected deleterious materials or limited historical data. 
  2. Not required for aggregate sources listed on the non-alkali silica reactive aggregate list.
  3. Submit mill certifications covering the last six months of manufacturing for Department review (subject to availability). 
  4. May also be required for other types of concrete producers when specified in contracts. 

RMS 043 Cement Concrete Mix Design Sheet 

General 

Mix designs shall be formulated and submitted in accordance with Section M4 Cement Concrete and Related Materials: 

  • Producers shall report proposed mix design formulations on a Department issued mix design sheet in its entirety and submit annually to the Department for review. 
  • The proportions reported on the mix design sheet shall yield 27.0 ft³ (1 yd3) of concrete. 
  • Proposed mix design formulations shall be prequalified by the Department prior to construction. Placement of mix design formulations prior to Department prequalification shall be prohibited. 
  • Prequalification signifies Department verification of a mix design formulation’s conformance to design targets and limits at the time of review or testing but does not signify Department authorization or endorsement for specific contract work items. 
  • Modifications to prequalified mix design formulations outside the scope of allowable adjustments shall be prohibited. Such modifications shall require a new mix design formulation submission to the Department for review. 
  • Mix design formulations not prequalified by the Department shall be prohibited from use. 

Division III Materials, Section M4 Concrete and Related Materials specifies the types of concrete, which are referenced in the following table. Please note that the section numbers and description are based on the future January 2027 edition of the MassDOT Standard Specifications. 

Types of Concrete 

Section Type Description 
M4.04.0 CP-E Extended Concrete Products 
M4.04.0 RHCP-E Extended Rapid Hardening Concrete Products 
M4.06.1 CC Conventional Concrete 
M4.06.2 HPC High Performance Concrete 
M4.06.3 HESC High Early Strength Concrete 
M4.06.4 RHC Rapid Hardening Concrete 
M4.06.5 LWC Lightweight Concrete 
M4.06.6 SCC Self-Consolidating Concrete 
M4.06.7 ESC Exterior Slab Concrete 
M4.06.8 PC Pavement Concrete 
M4.06.9 MPC Mass Placement Concrete 
M4.06.10 FRC-I Steel Fiber Reinforced Concrete 
M4.06.10 FRC-II Glass Fiber Reinforced Concrete 
M4.06.10 FRC-III Synthetic Fiber Reinforced Concrete 
M4.06.10 FRC-IV Natural Fiber Reinforced Concrete 
M4.06.11 UHPC Ultra-High Performance Concrete 
M4.06.12 SHOT-D Dry Mix Shotcrete 
M4.06.12 SHOT-W Wet Mix Shotcrete 
M4.06.13 UWC Underwater Concrete 
M4.06.14 DC Drycast Concrete 
M4.06.15 LMC Latex Modified Concrete 
M4.06.16 ICC Internally Cured Concrete 

New MassDOT Mix Design Identification System 

A new MassDOT mix design identification (ID) system will be launched for the 2027 cycle: 

Figure 1: New MassDOT Mix Design ID System  

Figure 1: New MassDOT Mix Design ID System

The MassDOT mix design ID must be provided for each load of concrete delivered through one or more of the following options: 

  • Reported directly on the batch ticket 
  • Batch ticket supplemented with MassDOT prequalification letter and mix design sheet with the mix design clearly identified. 

Features of the RMS 043 Cement Concrete Mix Design Sheet 

The RMS 043 Cement Concrete Mix Design Sheet is an excel macro-enabled workbook that includes many features to assist the Producer in mix design formulation development. For more information, please access the file on the Concrete Producer SharePoint Site Forms Library and navigate to the “Legend” tab. 

Submission of Previously Prequalified RMS 043 Sheets 

MassDOT RMS will conduct the following activities: 

  • Transfer the previously prequalified 2026 design quantities to the 2027 RMS 043 Mix Design Sheet using the new mix design ID system and upload the macro-enabled Excel (.xlsm) file to the producer’s 2027 Concrete Producer SharePoint library. 

The Concrete Producer shall conduct the following activities: 

  • Enter in any remaining entry fields, data, and test results 
  • Adjust the aggregate design quantities (if necessary) to yield to 27.0 ft³ (1 yd3) of concrete 
  • Review the transferred design quantities for accuracy 
  • Notify MassDOTConcrete@dot.state.ma.us that the submission is ready for Department review 

Submission of New Proposed Mix Design Formulations 

Mix design formulations are considered “new” under the following conditions: 

  • Never prequalified by MassDOT RMS 
  • New design quantities (aside from minor adjustments in aggregate due to slight changes in specific gravity and gradation) 
  • New constituent materials sources (even if the design quantities are the same as a previously prequalified mix design) 

The Concrete Producer shall conduct the following activities when submitting new proposed mix design formulations: 

  • Report new proposed mix design formulations on the RMS 043 Mix Design Sheet. 
  • Upload the completed RMS 043 Mix Design Sheet to their 2027 Cement Concrete Producer SharePoint site library in the Microsoft Excel Macro Enabled (.xlsm) file format 

Editing Submissions Prior to Prequalification 

Before prequalification, producers may complete saved RMS 043 sheets, correct errors, address Department review comments, and modify design targets based on trial batch results. Refer to the video demonstration on the 2027 Concrete Producer SharePoint Site for submission and editing procedures. Notify MassDOT RMS when the revised submission is ready for review in accordance with the procedures identified on this page. 

Aggregate Source Licensing 

Massachusetts legislation with regards to aggregate source licensing for the production of cement concrete (cast-in-place concrete only) was signed into law on October 17, 2023. All aggregate sources incorporated into cast-in-place concrete shall be licensed prior to Department approval of proposed mix design formulations. Submission of aggregate license applications shall be conducted through the Aggregate Source Licensing Program ePLACE Portal. Please refer to the table below for more information. 

Petrographic Examination 

Aggregate with suspected deleterious materials or limited historical data shall be examined through ASTM C295 and petrographic examination reports shall be submitted to the Department for review. Aggregate shall be sufficiently limited of deleterious materials that negatively affect cement concrete performance, including workability, setting, hardening, aggregate-cement bond, strength, color, long-term durability, and other properties (refer to Section M4) 

Alkali Silica Reaction (ASR) Testing 

Non-Reactive Aggregate 

The following aggregate sources are considered non-reactive and will not require annual ASR testing: 

Mix designs that incorporate both a non-reactive coarse aggregate source and a non-reactive fine aggregate source identified on the Qualified Construction Materials List (QCML) shall still meet the minimum SCM content targets specified in Section M4. 

Reactive Aggregate 

All reactive aggregates (not listed on the QCML for cement concrete non-alkali silica reactive aggregate sources) shall be tested for ASR by an independent laboratory listed on the Qualified Alkali-Silica Reactivity (ASR) Testing Laboratories list, using the same supplementary cementitious materials (SCMs) and cementitious sources and proportions reported on the mix design sheet. 

To become MassDOT qualified, independent ASR testing laboratories must participate in the CCRL ASR Proficiency Program, score greater than or equal to 3, and submit the CCRL final report directly to the following e-mail address for review: 

Environmental Product Declarations (EPDs) 

General 

Massachusetts General Law (MGL Part I, Title II, Chapter 7C, Section 73 Carbon Intergovernmental Coordinating Council; Carbon Reduction Plan was signed into law in 2025: 

Please refer to the Massachusetts Embodied Carbon Reduction Plan for more information: 

As a result of this legislation, Section M4 Cement Concrete and Related Materials was updated in 2025 to include mix design requirements for sustainability: 

  • When specified in contract documents and special provisions. 
  • The cradle-to-gate (ISO 21930 life cycle modules A1, A2, and A3) global warming potential (GWP) values shall be reported on EPDs in accordance with the following International Organization for Standardization (ISO) publications.
  • GWP values for concrete are based off U.S. eastern regional benchmarks. The GWP values will be updated in the 2027 standard specifications based on new data and reports. 

Requirements 

Concrete producers must prepare and submit EPDs for each mix design formulation. Please refer to the following key dates provided below. 

EPD Reporting Requirements and Implementation Timeline 

Date Requirements 
2026 Voluntary collection of EPDs and materials quantities (cubic yards of concrete) 
2027 Mandatory collection of EPDs and materials quantities (cubic yards of concrete) 
Mid-2028 Proposed mandatory EPD and quantity reporting for ready-mixed concrete used on covered projects 
Mid-2028 Proposed project-average Global Warming Potential (GWP) limits for concrete and other listed materials 

International Organization for Standardization (ISO) Publications 

Standard Title 
ISO 14025 Environmental labels and declarations – Type III environmental declarations – Principles and procedures 
ISO 14040 Environmental management – Life cycle assessment – Principles and framework 
ISO 14044 Environmental management – Life cycle assessment – Requirements and guidelines 
ISO 21930  Sustainability in buildings and civil engineering works – Core rules for environmental product declarations of construction products and services 

4.0 Prequalification and Qualified Construction Materials List (QCML) Program

Prequalification 

The following prequalification procedures are provided below 

Concrete Producer and Mix Design Prequalification 

Prequalified concrete Producers will receive e-signed Department prequalification letters via email. Additionally, the prequalified company name, plant location, and mix design formulations will be published onto the QCML. Concrete Producers shall conduct the following for prequalification: 

  • New Precast or Prestressed Concrete Plants: Request plant inspections and prequalification (trial batch) testing via email to MassDOTConcrete@dot.state.ma.us 
  • New Ready Mix Concrete Plants and Portable Concrete Mixing Companies: Request plant inspections and prequalification (trial batch) testing via email to MassDOTConcrete@dot.state.ma.us and the District Materials Engineer (DME) 
  • Volumetric Mix Concrete: Request calibration for each mixer and prequalification (trial batch) testing for each mix design formulation via email to MassDOTConcrete@dot.state.ma.us and the District Materials Engineer (DME) 
  • Complete and upload all required preliminary submittals 

Prequalification (trial batch) testing of cement concrete mix design formulations shall be required under the following conditions: 

  • Concrete is produced by volumetric mixers 
  • Producer or plant location is not currently prequalified 
  • Proposed mix design formulation incorporates new sources of constituent materials not currently prequalified 
  • Proposed mix design formulation incorporates new design quantities and design targets that have never been prequalified 
  • At the discretion of the Department 

If required, concrete Producers shall conduct the following for prequalification (trial batch) testing: 

  • Complete and upload all required preliminary submittals 
  • Select a Department recognized laboratory to conduct the required field and laboratory prequalification sampling and testing 
  • Request prequalification sampling and testing via email to MassDOTConcrete@dot.state.ma.us and the District Materials Engineer (DME) 
  • Conduct prequalification sampling and testing in the presence of MassDOT RMS Inspectors. The Department will obtain sampled concrete cylinders to conduct its own laboratory testing. Specified test methods not available for testing by the Department shall be conducted by a Department recognized laboratory selected by the Producer. 

Prequalified concrete Producers will receive e-signed Department prequalification letters via email for test results meeting standard specifications. Non-conformance reports (NCRs) will be generated by MassDOT RMS and sent to the Producer for test results not meeting standard specifications (covered under the Verification subsection). 

Cementitious Materials Prequalification 

Prequalified sources will be published onto the QCML. Sources that are not listed on the QCML, concrete Producers shall conduct the following for prequalification: 

  • Submit the previous six months of mill certifications (if obtainable) 
  • Submit new RMS 043 Mix Design Sheet with the new source reported (see preliminary submittals) 
  • Coordinate and conduct prequalification (trial batch) testing in the presence of MassDOT RMS Inspectors 
  • Provide 25 lbs. sample of the new source to MassDOT RMS for testing 

Aggregate 

Sources with suspected deleterious materials or limited historical field and test data, concrete Producers shall conduct the following for prequalification: 

  • Complete and upload all required preliminary submissions 
  • Submit new RMS 043 Mix Design Sheet with the new source reported 
  • Coordinate and conduct prequalification (trial batch) testing in the presence of MassDOT RMS Inspectors 
  • Provide sample of the new source to MassDOT RMS for testing 

Prequalified sources will be published on the RMS 043 Mix Design Sheet (Currently, there is no QCML for Aggregate). Please note, the Aggregate Source Licensing Program (for cast-in-place concrete only) is a separate prequalification requirement. For more information, refer to 3.0: Preliminary Submissions. 

Chemical Admixtures 

MassDOT RMS publishes the prequalified product onto the QCML with expiration date (5-year prequalification cycles). Chemical admixture Manufacturers shall conduct the following for prequalification: 

  • Submit to and participate in the AASHTO Product Evaluation and Audit Solutions Program for Chemical Admixtures (formerly known as NTPEP) 
  • Submit to the following email address for review: 
  • MassDOTQCML@dot.state.ma.us 

Verification 

Prequalified mix designs and their corresponding constituent materials, including cementitious materials and aggregate will be sampled and tested by MassDOT RMS throughout the year, to verify conformance to Section M4: Cement Concrete and Related Materials. Concrete Producers will be notified of constituent materials not meeting standard specifications, via email, with the non-conformance report (NCR) attached. Concrete producers shall conduct the following when an NCR is issued: 

  • Complete the proposed disposition, which includes the root cause, proposed corrective action, and action to prevent recurrence 
  • Complete the proposed by, title, signature, and date entry fields 
  • Submit the completed NCR via the original email chain for disposition review and corrective action verification 

Contact