Western Massachusetts Hospital – HVAC Mechanical Upgrades

Find details about upgrades to the HVAC mechanical systems of the main building of this 102 bed chronic care facility.

Project Details

Western MA Hospital

Study Designer: Cannon Boston, Inc.
Contractor: Whiting-Turner Contracting Company, Inc.
Project Type: CM at Risk
Gross Square Feet: 93,000
Est. Total Project Cost: $36,000,000

Est. Construction Substantial Completion Date:  Summer 2023

 

Project Features

Western Massachusetts Hospital is a 102 bed chronic care facility located in Westfield that was built in 1937. The project replaced the original  mechanical systems and provided new heating, ventilation, and central air conditioning systems; upgrades to the electrical systems; replaced the existing roof and windows; and completed accessibility upgrades.