Project Details
Project Title
53 River Street Dam Removal
Municipality or Organization
Town or Acton
MVP Region
Northeast
Award Year
FY2020
Grant Award
$150,000
Project Overview
The Town of Acton worked to transform the former mill site at 53 River Street into a climate-resilient public open space. The Town is using nature-based solutions to restore the site's natural environment, improve stormwater management, and create an accessible space for residents.
The project included design and permitting for the ultimate removal of a failed dam, contaminated soil removal, restoration of Fort Pond Brook, and improvements to the surrounding floodplain.
Climate Challenges
The River Street Dam was identified as a failing structure requiring immediate attention. The surrounding property, formerly occupied by mill buildings and paved surfaces, also presented environmental challenges.
Located near Fort Pond Brook, the site lacked adequate stormwater management infrastructure. These conditions created an opportunity to improve climate resilience through dam removal, ecological restoration, and the reestablishment of natural floodplain functions.
Design plans for 53 River Street park in Acton
Project Goals
The Town's primary goal was to transform 53 River Street from a former industrial site into a resilient, accessible public open space.
Project goals included design and permitting to:
- Remove the failed River Street Dam and restore the natural flow of Fort Pond Brook.
- Remove contaminated soil and improve environmental conditions.
- Reestablish the natural floodplain to improve stormwater management and groundwater recharge.
- Incorporate native vegetation and shade trees to support ecological restoration.
- Create accessible pathways and welcoming public spaces for residents.
Project Approach and Results
The Town worked with engineering and design professionals to plan the dam removal and develop a vision for a climate-resilient park.
SLR Consultants assisted with dam removal planning and environmentally focused solutions. Dennis Dale Design supported the development of a park design for the former dam and mill site.
Restoration work would include removing the failed dam, removing more than 1,000 tons of contaminated soil, restoring the Fort Pond Brook channel, and reestablishing the natural floodplain.
These improvements will enhance conditions at both the site and downstream. The restoration will also contribute to the return of fish species, including catfish and trout.
Additional work focuses on final site grading, planting native vegetation and shade trees, and establishing accessible pathways.
Lessons Learned
- Community involved early in the process is necessary to ensure buy-in on plans and actions.
- Consultation with the Conservation Commission and Agent from the beginning helped ensure thoughtful solutions were incorporated into design and actions.
- Funding continued to be a challenge throughout the project due to unforeseen contamination in the soil.
Project Partners
- Conservation Commission – local permitting body for improvements
- Conservation Agent – provided (and continues to provide) valuable insight on native species and site improvements that focus on climate resilience and river bank stabilization
- Select Board – provided the platform to inform the community on importance of project and space to update residents on project
- EEA Dam & Seawall Grant Program - provided over $1.4M to help with dam removal and site improvements
- SLR Consultants, S&R Construction, PMA Associates, Dennis Dale Design, and the 53 River Street Master Plan Committee who worked together through Town staff to ensure the project moved forward and captured the intent identified by the community
- Representative Danillo Sena who helped secure a State earmark that helped offset project expenses