EFSB/Siting Calendar

View the EFSB/Siting Calendar for events and hearings

Calendar

DateEventsAdditional Information
June 25th, 2025

Public Comment Hearing

Palmer-To-Ware Transmission Project

EFSB 24-02/D.P.U. 24-190

Palmer High School Auditorium


4105 Main St
Palmer, MA 01069

6:30 PM - 8:00 PM

The Siting Board will conduct a public comment hearing with both in-person and remote participation options.


Remote attendees: please join by clicking the following link.


For audio-only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 862 6287 1350.

Link to the full notice can be accessed here

 
May 5th, 2025

Stakeholder Session #4

Hybrid

221 Appleton Street, Holyoke Heritage State Park, Holyoke, MA 01040

5:30 PM - 8:30 PM

Remote attendees for all sessions can join by clicking this link from a computer, tablet, or smart device. 

For audio-only participation attendees can dial in at (646) 828-7666 (not a toll-free number) and then enter the Webinar ID:161 000 0543. For each hybrid stakeholder session, there will be light refreshments.

EFSB, DPU, DOER, and OEJE also welcome written comments on the straw proposals. Written comments on each topic will be most useful if submitted two weeks after the relevant stakeholder session (i.e., latest by April 24, 2025 for the topics from Stakeholder Session 1). Any person seeking to comment must file their comments by email or email attachment sent to the following email addresses: sitingboard.filing@mass.gov.

 
April 29th, 2025

Public Comment Hearing (Virtual)

Westfield Battery Project

EFSB 25-04/D.P.U. 24-151

6:30 PM - 9:00 PM

Please Note: This public comment hearing has now been cancelled. 

Attendees: please join by clicking this link.

For audio- only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 846-3271-6786.

To provide comments by telephone, please leave a voicemail message referencing “EFSB 25-04/D.P.U. 24-151” at (617) 305-3544 with your name, telephone number, and mailing address by noon Monday, April 28, 2025. Pre-registered commenters will speak first, and other commenters afterward.

The Siting Board also invites written comments on the Project. Written comments will be most useful to the Siting Board if submitted by Tuesday, May 13, 2025.

At the public comment hearing, the Company will present an overview of the Project. Public officials and members of the public will have an opportunity to ask questions and provide comments about the proposed Project. The public comment hearing will be transcribed by a court reporter. A recording of the public comment hearing will be available on the Siting Board’s YouTube channel.  

Link to the full notice can be accessed here

 
April 24th, 2025

Stakeholder Session #3

Hybrid

1234 Columbus Avenue, Roxbury Community College Student Commons, Room 3, Roxbury, MA 02120

5:30 PM - 8:30 PM

Remote attendees for all sessions can join by clicking this link from a computer, tablet, or smart device.

For audio-only participation attendees can dial in at (646) 828-7666 (not a toll-free number) and then enter the Webinar ID:161 000 0543. For each hybrid stakeholder session, there will be light refreshments.

EFSB, DPU, DOER, and OEJE also welcome written comments on the straw proposals. Written comments on each topic will be most useful if submitted two weeks after the relevant stakeholder session (i.e., latest by April 24, 2025 for the topics from Stakeholder Session 1). Any person seeking to comment must file their comments by email or email attachment sent to the following email addresses: sitingboard.filing@mass.gov.

 
April 17th, 2025

Stakeholder Session #2

Virtual

1PM - 4PM

Remote attendees for all sessions can join by clicking this link from a computer, tablet, or smart device.

For audio-only participation attendees can dial in at (646) 828-7666 (not a toll-free number) and then enter the Webinar ID:161 000 0543. For each hybrid stakeholder session, there will be light refreshments.

EFSB, DPU, DOER, and OEJE also welcome written comments on the straw proposals. Written comments on each topic will be most useful if submitted two weeks after the relevant stakeholder session (i.e., latest by April 24, 2025 for the topics from Stakeholder Session 1). Any person seeking to comment must file their comments by email or email attachment sent to the following email addresses: sitingboard.filing@mass.gov.

 
April 15th, 2025

Evidentiary Hearings

Crystal Spring Extension Project

EFSB 25-03/D.P.U. 24-93 & 24-94

9AM - 4PM

The April 16, 2025 evidentiary hearing has been canceled.

The Siting Board will hold evidentiary hearings on April 15 & 16, 2025 in the above-referenced matter.

Hearings will be held virtually via Zoom and held from 09:00 A.M. and conclude no later than 4:00 P.M.

Remote attendees can join by clicking on the available link.

Video recordings of the hearings can be accessed afterwards at the DPU YouTube channel.

 
April 10th, 2025

Stakeholder Session #1

Hybrid

One South Station, 3rd floor, Large Hearing Room, Boston, MA 02110

1PM - 4PM

Remote attendees for all sessions can join by clicking this link from a computer, tablet, or smart device.

For audio-only participation attendees can dial in at (646) 828-7666 (not a toll-free number) and then enter the Webinar ID:161 000 0543. For each hybrid stakeholder session, there will be light refreshments.

EFSB, DPU, DOER, and OEJE also welcome written comments on the straw proposals. Written comments on each topic will be most useful if submitted two weeks after the relevant stakeholder session (i.e., latest by April 24, 2025 for the topics from Stakeholder Session 1). Any person seeking to comment must file their comments by email or email attachment sent to the following email addresses: sitingboard.filing@mass.gov.

 
April 8th, 2025

Public Comment Hearing

Everett Battery Project

EFSB 25-05/D.P.U. 24-152

6:30 PM - 8:00 PM

Remote attendees: join by clicking this link
 

For audio-only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 811 3615 9773.


 Pre-Registered commenters will speak first, and other commenters afterward.

At the public comment hearing, the Company will present an overview of the Project. Public officials and members of the public will have an opportunity to ask questions and provide comments about the proposed Project. The public comment hearing will be transcribed by a court reporter. A recording of the public comment hearing will be available on the Siting Board’s YouTube channel.  

Link to the Full Notice can be accessed here

Translated copies of this notice are available in Spanish, Haitian Creole, Arabic, Portuguese, and Standard Chinese.
 

 
March 31st, 2025

Public Comment Hearing 

HMLP Reliability Project

EFSB 24-01

6:30 PM  - 9:00 PM

Remote attendees: join by using this link from a computer, tablet, or smart device. For audio-only participation attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 817 6313 5360.

At each public comment hearing, HMLP will present an overview of the Project. Public officials and members of the public will have an opportunity to ask questions and comment about the Project. The public comment hearings will be transcribed by a court reporter. Recording of the public comment hearings will be posted to the Siting Board’s YouTube channel after each hearing.

Link to the Full Notice can be accessed here.

 
March 25th, 2025

Public Comment Hearing

HMLP Reliability Project

EFSB 24-01

6:30 PM - 9:00 PM

Remote attendees: join by using this link from a computer, tablet, or smart device. For audio-only participation attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 817 6313 5360.

At each public comment hearing, HMLP will present an overview of the Project. Public officials and members of the public will have an opportunity to ask questions and comment about the Project. The public comment hearings will be transcribed by a court reporter. Recording of the public comment hearings will be posted to the Siting Board’s YouTube channel after each hearing.

Link to the Full Notice can be accessed here.

 
December 5th, 2024

Public Comment Hearing

Westfield Battery Project

EFSB 25-04/D.P.U. 24-151

6:30PM - 8:00PM

The Department will conduct a public comment hearing with both in-person and remote participation options on: Thursday, December 5, 2024, at 6:30 p.m. In-person hearing location: Scanlon Hall (Building 15) - Loughman Room, Westfield State University, 577 Western Avenue, Westfield, MA 01086. 

Free parking is accessible adjacent to Scanlon Hall. Use the campus Main Entrance on Western Avenue, take first left on Parenzo Road and park in lot (additional parking just beyond on Scanlon Road). Follow signs for short walk to Scanlon Hall.

Remote attendees: join by clicking (or entering) the publicly available link from a computer, tablet, or smart device. 

For audio-only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 899 6203 6437.  

Pre-registered commenters will speak first, and other commenters afterward. The Department also invites written comments on the Project. Written comments will be most useful to the Department if submitted by December 20, 2024

The Official Notice for the Event is now available.

 
November 19th, 2024

Evidentiary Hearing

Park City Wind Zoning

D.P.U. 24-48

10AM - 5PM

Please click the publicly available link to join the webinar.

Dial-In  646-558-8656

Webinar ID: 851 6450 7128

 
October 1st, 2024

Board Meeting

SouthCoast Wind Energy Brayton Point

EFSB 22-04

1PM-5PM

The Massachusetts Energy Facilities Siting Board will conduct a public meeting at 1:00 p.m. on Tuesday, October 1, 2024, to consider the Tentative Decision in the above-referenced matter.

Pursuant to Massachusetts Open Meeting Law, G.L. c. 30A, §§18-25; 980 CMR 2.04(1), the Siting Board will conduct a hybrid in-person/remote Siting Board meeting to hear comments, deliberate, and vote on the Tentative Decision on Tuesday, October 1, 2024, at 1:00 p.m. at 1 South Station, Department of Public Utilities, 3rd Floor Large Hearing Room, Boston, Massachusetts. The purpose of the Siting Board meeting is to listen to comments, deliberate, and vote on whether to approve, approve with conditions or amendments, or reject a Tentative Decision issued by the Siting Board. The Tentative Decision is also now available on the Siting Board’s information webpage for this proceeding.

The agenda related to this meeting is available in both English & Portuguese

The parties may provide written comments to the Siting Board on or before noon on Monday, September 30, 2024.  Please file comments by email to Robert.j.shea@mass.gov and dpu.efiling@mass.gov. Parties will also be permitted to present brief oral comments at the Siting Board meeting.

Attendees can join by clicking (or entering) the publicly available link from a computer, smartphone, or tablet. No prior software download is required. For audio-only access, call (646) 558-8656 (not toll free) and enter ID: 896 9026 2374. Interpretation services for the Siting Board meeting (in-person and Zoom) will be provided in Spanish, Portuguese, and Cape Verdean Creole. Additional language interpretation services are available upon request. Include in your request the language required and a way to contact you if we need more information. Requests must be made no later than September 24, 2024. It may not be possible to accommodate last-minute requests.

Link to the Board Meeting Notice in English, Spanish, & Portuguese

 
September 26, 2024

Public Comment Hearing

Crystal Spring Extension Project

D.P.U. 24-93/24-94

The Department will conduct a public comment hearing with both in-person and remote participation options: 6:30 P.M., Thursday, September 26, 2024

In-person hearing location: Old Rochester Regional High School Auditorium, 135 Marion Rd, Mattapoisett, MA 02739.

Remote attendees: join by clicking (or entering) the publicly available link from a computer, tablet, or smart device. For audio-only participation, attendees can dial in at (646) 558-8656 (not a toll-free number)] and then enter the Webinar ID: 83515775880.

Simultaneous Portuguese interpretation will be provided.

Written Oral Comments must be submitted by noon on September 25th. 2024.

 
September 10, 2024

Evidentiary Hearings

Warwick-to-Sterling Replacement Project

EFSB 23-02

10 AM-5 PM

The September 12, 2024 evidentiary hearing has been cancelled.

Topic:  Petition of New England Power Company d/b/a National Grid Pursuant to G.L. c. 164, § 69J for Approval to Construct, Operate and Maintain a New Double Circuit Overhead Transmission Line
and Two Associated Tap Lines

The Siting Board will hold evidentiary hearings on September 10th, 2024 in the above-referenced matter.

Hearings will be held virtually via Zoom from 10:00 AM to no later than 5:00 PM.

Remote Attendees can attend by clicking the publicly available link

Or Dial-In 646-558-8656 then ID# 896 4033 4470

 
September 3-30, 2024

Notice of MA Energy Facilities Siting Board Proposed Action by Consent

Park City Wind

EFSB 20-01

9AM-5PM

 NOTICE

The Massachusetts Energy Facilities Siting Board (“Siting Board”) hereby provides notice of a proposed Action by Consent. The Action by Consent corrects an omission in Condition S of the Siting Board’s Final Decision in Park City Wind LLC, EFSB 20-01/D.P.U. 20-56/20-57 (December 15, 2023) (“Final Decision”). Condition S requires Park City Wind LLC to provide certain compliance filings that “demonstrat[e] that the Onshore Substation’s actual noise profile is consistent with the modeled results it has presenting in this proceeding.” Final Decision at 154. Condition S in the Final Decision references equipment in Exhibit VW-7, at 7-12, Table 7-3. The Siting Board intended for Condition S to apply to all noise producing equipment at the proposed Substation, including additional equipment listed in Exhibit VW-7, at 7-13, Table 7-4. This Action by Consent corrects that omission, and adds reference to equipment at Exhibit VW-7, at 7-13, Table 7-4 to Condition S. The Action by Consent is taken pursuant to 980 CMR 2.07, which provides the Siting Board with the authority to render a decision, other than a final decision in an adjudicatory proceeding, by Action by Consent, when the Board determines that expeditious action is necessary. The EFSB 20-01/D.P.U. 20-56/20-57 Page 2 FAX: (617) 345-9101 TTY: (800) 323-3298 www.mass.gov/dpu Action by Consent requires the unanimous written consent of all members of the Siting Board to become effective. The Action by Consent shall become void if not signed by all members of the Siting Board prior to the next meeting of the Board. 980 CMR 2.07(3).

As required by the Siting Board’s regulations, a copy of this Notice shall be filed with the Secretary of State and the Executive Office for Administration and Finance at least 48 hours prior to circulation of the Action by Consent to the Siting Board members for their signature.

A full text of the proposed Action by Consent may be obtained by requesting a copy from the offices of the Energy Facilities Siting Board, One South Station, Boston, MA 02110. To request a copy, or for additional information, please contact Joan Foster Evans, Esq., at joan.evans@mass.gov.

Link to the Full Notice

 
June 18 - July 8, 2024Notice of MA Energy Facilities Siting Board Proposed Action by Consent

The Massachusetts Energy Facilities Siting Board (“Siting Board”) hereby provides notice of a proposed Action by Consent. The Action by Consent delegates to the Secretary of the Executive Office of Energy and Environmental Affairs (the “Secretary”) authority to sign on behalf of the Siting Board an engagement letter (“Engagement Letter”) with Mintz, Levin, Cohn, Ferris, Glovsky and Popeo, P.C. (“Mintz”), relating to Superior Court litigation in Commonwealth of Massachusetts v. Exxon Mobil Corporation, Civil Action No. 1984-CV-03333-BLS1 (“Litigation”).

The Attorney General for the Commonwealth of Massachusetts initiated the Litigation on October 24, 2019, alleging multiple violations of G.L. c. 93A by Exxon Mobil Corporation. On April 30, 2024, Exxon Mobil Corporation served the Siting Board a subpoena duces tecum (“Subpoena”). The Subpoena relates to Superior Court litigation in Commonwealth of Massachusetts v. Exxon Mobil Corporation, Civil Action No. 1984-CV-03333-BLS1. The Siting Board is not a party to the litigation. In the Engagement Letter, Mintz agrees to represent the Siting Board in the Litigation, involving third-party subpoenas filed by Exxon Mobil Corporation.

The Action by Consent is taken pursuant to 980 CMR 2.07, which provides the Siting Board with the authority to render a decision, other than a final decision in an adjudicatory proceeding, by Action by Consent, when the Board determines that expeditious action is necessary. The Siting Board may delegate Board-specific responsibilities other than responsibility for the final decision in any matter to the Board Chairman or to the Board staff. 980 CMR 2.05. The Siting Board makes the delegation to the Secretary by Action by Consent rather than by meeting. The Action by Consent requires the unanimous written consent of all members of the Siting Board to become effective. The Action by Consent shall become void if not signed by all members of the Siting Board prior to the next meeting of the Board. 980 CMR 2.07(3).

As required by the Siting Board’s regulations, a copy of this Notice shall be filed with the Secretary of State and the Executive Office for Administration and Finance at least 48 hours prior to circulation of the Action by Consent to the Siting Board members for their signature.

A full text of the proposed Action by Consent may be obtained by requesting a copy from the offices of the Energy Facilities Siting Board, One South Station, Boston, MA 02110. To request a copy, or for additional information, please contact Joan Foster Evans, Esq., at joan.evans@mass.gov.

Link to the Full Notice

Link to the Signed Declaration Order

 
June 27, 2024

Siting Board Meeting

EFSB 22-03

Greater Cambridge Energy Program

9:00 AM

Topic: Petition of NSTAR Electric Company d/b/a Eversource Energy Pursuant to G.L. c. 164, § 69J for Approval to Construct and Operate Eight New 115-kV Electric Transmission Lines in Portions of Cambridge, Somerville, and Boston.

In-person location: 1 South Station, Department of Public Utilities, 3rd Floor Hearing Room, Boston, Massachusetts.

Attendees can join by clicking (or entering) the publicly available link from a computer, smartphone, or tablet.  No prior software download is required.  For audio-only access, call (646) 558-8656 (not toll free) and enter ID: 8947-631-4615  

Agenda:  English | Haitian Creole | Portuguese | Simplified Chinese | Spanish.

 
June 18, 2024

Public Comment Hearing

D.P.U 24-48

Park City Wind Zoning

6:30 PM

Topic: A petition from Park City Wind for a zoning exemption in Barnstable.

In-person hearing location:

Barnstable High School Performing Arts Center

744 West Main Street, Hyannis, MA 02601

Remote attendees: please join by clicking (or entering) the publicly available link from a computer, tablet, or smart device. 

For audio-only participation, attendees can dial in at (646) 558-8656 (not a toll-free number)] and then enter the Webinar ID: 840-2714-6809

 

May 13, 15, 2024

Evidentiary Hearing

EFSB 19-06A

Mid-Cape Project Reliability Change

10AM - 5PM

Topic: EFSB 19-06A/DPU 19-142A/143A/23-22 Mid-Cape Reliability Project Change and West Barnstable Substation Zoning Exemption

Please click on the publicly available link to join the webinar.

 
April 11, 2024

Public Comment Hearing

EFSB 23-02/D.P.U. 23-45

Sterling-Warwick (National Grid)

6:30PM

Topic: EFSB 23-02/D.P.U. 23-45 - New England Power Company d/b/a National Grid A1/B2 Refurbishment: Warwick to Sterling Transmission Replacement Project

Fitchburg State University Ellis White Lecture Hall 160 Pearl Street Fitchburg MA 01420

Remote attendees: join by clicking (or entering) the publicly available link from a computer, tablet, or smart device. For audio only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 87501780143

 

April 10, 2024

Public Comment Hearing

EFSB 23-02/D.P.U. 23-45

Sterling-Warwick (National Grid)

6:30 PM

Topic: EFSB 23-02/D.P.U. 23-45 - New England Power Company d/b/a National Grid A1/B2 Refurbishment: Warwick to Sterling Transmission Replacement Project

Mount Wachusett Community College North Cafeteria 444 Green Street Gardner, MA 01440

Remote attendees: join by clicking (or entering) the publicly available link from a computer, tablet, or smart device. For audio only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 87501780143

 

April 10, 2024

Public Comment Hearing

EFSB 23-02/D.P.U. 23-45

Sterling-Warwick (National Grid)

1:00PM

Topic: EFSB 23-02/D.P.U. 23-45 - New England Power Company d/b/a National Grid A1/B2 Refurbishment: Warwick to Sterling Transmission Replacement Project

Athol Public Library Program Room 568 Main Street Athol, MA 0133

Remote attendees: join by clicking (or entering) the publicly available link from a computer, tablet, or smart device. For audio only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 87501780143.

 
February 26, 2024

Procedural Conference

EFSB 19-06A

9:30 AM -10:30 AM

Topic: EFSB 19-06A/ D.P.U. 19-142A/19-143A/23-22 - Mid-Cape Reliability Project NOPC & Zoning Exemption

Please click the publicly available link to join the webinar.

 
February 6, 2024

Evidentiary Hearings

D.P.U. 22-95

Somerset-Fall River Line Separation

10AM-5PM

Topic: Somerset - Fall River Line Separation D.P.U.22-95

Please click on the publicly available link to join the webinar.

+16465588656  Enter code: 816-9548-9703

 

Contact

Address

Department of Public Utilities
1 South Station, 3rd floor, Boston, MA 02110

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback