5.1 Status of Contracting Process

The original Request for Response (RFR) was posted by MassDOT in December of 2023, and two addendums were posted in February of 2024. This will be the only round of solicitation for the NEVI funding. The three vendors under contract with MassDOT from this procurement will be the vendors throughout the life of the project.

Table 4: Contracting Process Status

Round of Contracting (example: 1st Round of Three)Number of Proposals or Applications received 

Contract Type

(design-build-operate-maintain, design-build, or others) 

Date Solicitation ReleasedDate Solicitation ClosedDate of Award
One Round of Contracting for Solicitation 14

Contracting Structure:

1. Pre-Development Services Agreement

2. Task Order Solicitation

3. Site Specific Task Order

4. Limited Notice to Proceed

5. Notice to Proceed

Original: December 19, 2023

Addendum 1: February 13, 2024

Addendum 2: Feb 27, 2024

March 12, 2024 Intent to Award posted April 22, 2024

5.2 Awarded Contracts

Table 5 below summarizes the three vendors which are undergoing the contracting process with MassDOT. 

Table 5: Summary of Awarded Contracts

Round of Contracting (example: 1st Round of Three)Award Recipient 

Contract Type

(design-build-operate-maintain, design-build, or others) 

Location of Charging Station Award AmountEstimated Date of Operation
One Round of Contracting for SolicitationGlobal MontelloDesign-build-operate-maintainTBD – predevelopment services in progressTBDTBD
One Round of Contracting for SolicitationWeston and SampsonDesign-build-operate-maintainTBD – predevelopment services in progressTask 0: $63,350TBD
One Round of Contracting for SolicitationApplegreen Electric Design-build-operate-maintainTBD – predevelopment services in progressTBDTBD

5.3 Scoring Methodologies Utilized

Two rounds of evaluation occurred for the NEVI Formula Program responses to the RFR.

The first evaluation was the “Initial Response Qualitative Evaluation” which is outlined in Table 6 below. These initial response criteria were the first step in evaluating the responses. 

Table 6: Initial Response Qualitative Evaluation Criteria

CriteriaEvaluation MethodologyImportance
FinancialQualitativeLess Important
Past ExperienceQualitativeMore Important

After initial evaluation of the respondents, MassDOT posted a short-list of vendors to submit a full response on the MassDOT COMMBUYS website.

The Response Evaluation Criteria for the short-list of selected vendors included more detailed evaluations, outlined in Table 7 below.  

Table 7: Response Qualitative Evaluation Criteria

CriteriaEvaluation MethodologyImportance
Qualifications of the Respondent and PersonnelQualitativeMost Important
Approach to Pre-Development ServicesQualitative 
FinancialQualitative 
Past PerformanceQualitative 
Hourly RatesQualitativeLeast Important 

The four vendors were selected using this criteria, and specific sites will then be determined based on site evaluation criteria and a segment analysis methodology. See Section 8.1 for a breakdown of segment methodology and scoring.

For discussion on equity considerations of the individual sites, see Section 10.0.

5.4 Plan for Compliance with Federal Requirements

All federal requirements will be met through the contracting process. Contract Documents can be found on the MassDOT COMMBUYS website. Federal Requirement compliance is stated in “MassDOT NEVI - Pre-Development Services Agreement Exhibits (Addendum 2).pdf” Exhibit 1 under NEVI Rule.

MassDOT has hired an external consultant to independently verify all NEVI requirements are met through the design and construction of the charging sites. 