Material Properties
Damp-Proofing refers to chemical products that are applied to any concrete surface to prevent moisture from the ground from seeping into the bridge structure.
- The Manufacturer of the Damp-Proofing must certify that the product is in accordance with M9.09.2.
- The Manufacturer shall furnish information for any special application requirements.
Submittal and Testing Requirements
MassDOT Research & Materials (RMS) shall evaluate the Independent Lab Test Results. The following criteria must be met as part of the product submission:
- The test reports must be dated within 2 years from the initial submission or resubmission of a product.
- The independent lab must be recognized by the National Cooperation for Laboratory Accreditation (NACLA) in Construction Materials Engineering and Testing (CMET) or an equal program approved by MassDOT RMS.
- All submittals shall be certified to be in conformance with the manufacturer’s instructions.
- The material shall meet one of the following requirements:
- ASTM D449, Type II
- ASTM D1227, Type II – Class 1 or Type III – Class 1
Manufacturer requesting approval of Damp-Proofing shall furnish to MassDOT the following:
- Manufacturer/supplier shall submit 1-quart sample and the Safety Data Sheet with the application to RMS. Send material to:
MassDOT Research and Materials
Attn: Technical Services
5 Macadam Rd.
Hopkinton, MA 01748
QCML Listing, Expiration, and Re-Qualification
Once qualified, the Damp-Proofing product will be listed on the MassDOT QCML. The product shall remain on the qualified list for five (5) years unless one of the following occurs:
- If the product’s technology changes.
- If the product formulation or technology changes, the Manufacturer shall notify MassDOT RMS.
- The manufacturer will be required to submit certified test reports demonstrating conformance to the specification.
- MassDOT RMS determines that the product no longer meets the minimum requirements.
A written request for re-qualification must be submitted to the Department at least 60 days prior to the expiration date to remain on the QCML.