About the Multimodal Local Connections Working Group
The goal of the Multimodal Local Connections Working Group is to prioritize design alternatives for the Franklin Street Pedestrian Bridge, the Agganis Pedestrian Bridge, and the South Side Buffer Path by September 2026.
The Multimodal Local Connections Working Group meets from August to October 2024. The Core Working Group includes the following representatives:
- A Better City
- Accessibility Representative
- Boston University
- City of Boston
- Community Representative
- Depot Building Property Owner
- Harvard University
- MassBike
- Sect 106, Boston Landmarks Commission
The agency Chair of this meeting is MassDOT Complete Streets, and the Co-chair is the MassDOT Highway Design.
Meeting Materials
August 9, 2024
- Multimodal Local Connections Working Group meeting agenda - 8/9/24
- Multimodal Local Connections Working Group meeting summary - 8/9/24
- Multimodal Local Connections Working Group meeting Franklin St Pedestrian Bridge - 8/9/24
- Multimodal Local Connections Working Group meeting presentation - 8/9/24
- Multimodal Local Connections Working Group meeting Franklin St Graphics- 8/9/24
August 23, 2024
- Multimodal Local Connections Working Group meeting agenda - 8/23/24
- Multimodal Local Connections Working Group meeting summary - 8/23/24
- Multimodal Local Connections Working Group meeting presentation- 8/23/24
- Multimodal Local Connections Working Group meeting material 1 - 8/23/24
- Multimodal Local Connections Working Group meeting material 2 - 8/23/24
- Multimodal Local Connections Working Group meeting material 3 - 8/23/24