Project Overview
This project involved redesign and subsequent replacement of undersized drainage infrastructure as well as ecological and stream bank restoration. These improvements would increase the resiliency of the neighborhood and associated roadways, reduce localized flooding in current and future climates, and enhance the resiliency of over thirteen acres of residential land located within the Merrimack River floodplain.
Project Goals
- Incorporate nature-based solutions into the engineering and construction phases of the project.
- Replacing the existing culverts with more effective, resilient drainage infrastructure.
- Appropriately sized box culverts to reestablish an uninterrupted stream bed beneath the road crossing, which will provide improved aquatic habitat and promote ecological restoration.
- Stream bank restoration and the design and installation of water quality swales to encourage natural infiltration of stormwater runoff.
Project Approach and Results
The entire project was split into two phases:
- Field collection and analysis, modeling, design, and permitting
- Construction
The team, which consisted of several members of the Chelmsford Department of Public Works as well as consultants and engineers from Weston & Sampson, completed a topographical site survey, wetlands delineation, geotechnical assessment, climate change model, a hydrologic and hydraulic assessment, and public outreach initiatives. Each of these, after collective review, informed a structural and civil design for the project which aims to mitigate issues of increased flooding due to climate change and address presently failing, existing infrastructure.
At each stage of Phase I, the project team reached out to residents to educate and inform, then gather input and receive feedback on the ongoing issues in the neighborhood and to share the intent of the multi-phased project.
The designs that have resulted from the months of work spent compiling data and information will be submitted as part of a permitting packages and notice of intent that will be filed with the Army Corps of Engineers, MA DEP, and the local Conservation Commission.