DCR Multi-Use Trail Repair and Restoration Program

DCR owns and manages over 3,000 miles of forest roads and trails including over 250 miles of surface rail trails and multi-use pathways
crib wall before - after
Crib Wall Repairs by Student Conservation Association Crew, Massasoit State Park - Taunton

DCR Trails and Greenways Team has been working to assess, prioritize, repair and restore high priority trails in poor condition or that pose safety concerns. We also prioritize improvements to accessible trails. Restoration work may include repaving, patching, drainage improvements, boardwalks, treadway improvements, trailhead construction, trail closures, and new trail connections.

Table of Contents

Upcoming / Planned Trail Restoration Projects

  • Mausert’s Pond Loop Trail bridge replacement project, Clarksburg
  • Wells State Park – Accessible Trail restoration project, Sturbridge
  • Mt. Tom State Reservation – Accessible Trail reconstruction project, Holyoke
  • Baldpate State Park Boardwalk installation, Boxford
  • Bash Bish trail and viewing area enhancement project, Mt. Washington
  • Mt. Wachusett – Gates House Trailhead construction project, Princeton
  • Bellows South Trail bridge replacement project, Adams
  • New England Trail bridge replacement, Wendell State Forest

Completed Trail Restoration Projects

2023

  • Nashua River Rail Trail strategic pavement repairs and road crossing safety improvements, Ayer to Dunstable
  • Bash Bish State Park Trailhead improvements, Mt. Washington
  • Smokey Bear Loop Trail puncheon replacement project, Freetown
  • Middlesex Fells Skyline Trail restoration project
  • Ryan Playground pathway repairs, Boston

2022

  • Purgatory Chasm entrance, overlook and trail enhancement project, Sutton
  • Old Adams Road Trail bridge replacements, and tread and drainage repairs, Mt. Greylock State Reservation, Lanesboro
  • Freetown – Fall River State Forest off-highway motorcycle trail improvements, reroutes, signage and trail closures (phase 2)
  • Middlesex Fells Trail Closures project, Melrose
  • Southern New England Trunkline Trail reconstruction, Franklin
  • Mystic River Reservation – MacDonald Park pathway reconstruction, Medford

2021

  • Improvements, big-bridges and marking at the Washington Mountain Marsh Trail in Washington, Ma
  • Reroutes, bog-bridges, signage and trail closures at Beartown State Forest, Great Barrington
  • Accessible pathway reconstruction at the Eliot Tower site, Blue Hills Reservation
  • Freetown – Fall River State Forest off-highway motorcycle trail improvements, reroutes, signage and trail closures
  • Cape Cod Rail Trail strategic pavement repairs
  • Mystic River Reservation – Riverbend Park trail reconstruction, Medford
  • Cochituate State Park accessible trail connection project, Natick

2020

  • Improvements, signage and bog bridges at Dubuque State Forest, Hawley
  • 70-foot Dunbar Brook trail bridge replacement, Monroe State Forest
  • Pavement repairs to the Healthy Heart Trail at Chicopee State Forest
  • Tread and drainage repairs to the Bay Circuit Trail in Boxford State Forest, Middleton
  • Resurfacing of the shared use pathway at Nahant Beach, Nahant
  • Path repairs and resurfacing of the Upper Charles River Greenway, Farwell to Elm Streets, Watertown
  • Repairs to correct erosion and trail safety on the Halfway House Trail at Skinner State Park, South Hadley
  • Tread, drainage and signage improvements to various trails at Savoy Mountain State Forest, Savoy

Additional Resources

Contact   for DCR Multi-Use Trail Repair and Restoration Program

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback