EFSB and DPU Siting Open Dockets

A list of active cases and related documents.

To view the online docket for the case, please visit DPU's file room. To access the docket: (1) copy the "file room location" listed below in the far right column of the table; (2) open the DPU file room; (3) paste the docket number in search box; and (4) click “Go.”

 

Open Dockets

Docket Number Description Documents Presiding Officer File Room Location
D.P.U. 17-147 Petition of NSTAR Electric Company d/b/a Eversource Energy Pursuant to Section 6 of Chapter 665 of the Acts of 1956 for Exemptions from the Boston Zoning Code in Connection with Modifications at the K Street Substation     17-147
D.P.U. 17-114 Petition of Hopkinton LNG Corp. Pursuant to G.L. c. 40A, § 3 for Individual and Comprehensive Exemptions from the Operation of the Zoning Bylaws of the Town of Hopkinton In Connection With Proposed Modifications of a Peak-Shaving Liquefied Natural Gas Facility.

 

Notice

Stephen August 17-114
EFSB 17-03 Petition of Harbor Electric Energy Company for a Jurisdictional Determination Pursuant to 980 C.M.R. §2.09

Schedule

Robert Shea EFSB17-03
EFSB 17-02/D.P.U. 16-77  Petition of NSTAR Electric Company d/b/a Eversource Energy Pursuant to G.L. c. 164, § 69J for Approval to Construct, Operate and Maintain a New 115-kV Transmission Line in the Towns of Sudbury, Hudson and Stow and the City of Marlborough and to Make Modifications to an Existing Substation in Sudbury.

Schedule

Notice 

Stephen August EFSB17-02
EFSB 15-1A/ D.P.U. 15-25A Project Change in reference to EFSB 15-1/D.P.U 15-25.

Schedule

Notice

Notice Attachment

M. Kathryn Sedor EFSB15-1A
EFSB 17-01 Petition of Exelon West Medway, LLC and Exelon West Medway II, LLC for a Certificate of Environmental Impact and Public Interest Pursuant to G.L. c. 164, § 69 K½.

Schedule

Notice

Joan Evans EFSB17-01
EFSB 16-02/D.P.U. 16-77 Petition of NSTAR Electric Company d/b/a Eversource Energy for Approval to Construct and Operate a New 115-kV Combination Overheard/Underground Transmission Line in West Roxbury, Dedham and Needham Pursuant to G.L. c. 164, § 72

Schedule

Notice

M. Kathryn Sedor EFSB16-02
EFSB 15-06/D.P.U 15-180 Petition of NRG Canal 3 Development LLC for approval to construct and operate a new 350-MW peak electric generating unit in Sandwich pursuant to G.L. c. 164, § 69J¼.

Schedule

Notice

Robert Shea EFSB15-06
EFSB 15-04/D.P.U 15-140/15-141 Petition of NSTAR Electric Company d/b/a Eversource Energy and New England Power Company d/b/a National Grid for Approval to Construct and Maintain a New 345-kV Underground Transmission Line in Woburn, Winchester, Stoneham and Wakefield Pursuant to G.L. c. 164, § 69J.

Schedule

Supplemental Notice

Notice

Robert Shea EFSB15-04
EFSB 15-01/D.P.U 15-25 Petition of Exelon West Medway, LLC and Exelon West Medway II, LLC to Construct and Operate a 200-MW, dual-fuel oil, simple-cycle, quick-start Generating Facility located at the existing West Medway Generating Station site on Summer Street, in Medway, Massachusetts. Consolidated with Petition of Exelon West Medway LLC and Exelon West Medway II LLC, pursuant to G.L. c. 40A, § 3, for Certain Exemptions to the Zoning Bylaws of the Town of Medway to construct a 200 megawatt generation facility in Medway, Massachusetts.

Schedule

Notice

M. Kathryn Sedor EFSB15-01
EFSB 14-04/D.P.U. 14-153/14-154 Petition for approval to construct and operate two new underground 115 kV transmission lines and new substation in the cities of Boston, Everett and Chelsea, pursuant to G.L. c. 164, §69J and G.L. c.164, §72; and petition for exemption from the Boston Zoning Code, pursuant to Section 6 of Chapter 665 of the Acts of 1956.

Supplemental Schedule

Schedule

Notice

M. Kathryn Sedor EFSB 14-4
EFSB 14-02/D.P.U. 14-73/14-74 Petition for approval to construct, operate and maintain new 115-kV transmission line segments on existing ROW between the towns of Walpole and Holbrook; a new switching station in Sharon; and modifications to substations in Walpole and Holbrook, pursuant to G.L. c. 164, §69J, G.L. c.164, §72 and G.L. c.40A, §3, respectively.

Schedule

Notice

Stephen August EFSB 14-2