DPU Rail Monthly Report for November 2025

Beginning in 2025, each month the DPU Rail Transit Safety Division publishes a report highlighting our oversight work of the Massachusetts Bay Transportation Authority (MBTA) rail transit (subway) system. This report includes information about DPU oversight work conducted during the month of November 2025.

Fast Facts

Below are some "fast facts" about the DPU Rail Transit Safety Division's oversight work of the MBTA during the month of November 2025.  Numbers are current as of the last day of the reporting month and may be adjusted if data is updated post-submittal.

Fast Facts Explained

  • "Investigations" refers to DPU Rail Transit Safety Division's oversight of the investigations of MBTA safety events.
    • DPU's regulations delegate investigation responsibility to the MBTA on DPU's behalf.  While the MBTA conducts the investigation of safety events, the DPU observes and participates to ensure the investigation was done carefully and thoroughly.
  • "Investigation Final Reports" refers to final reports associated with safety events that MBTA is required to draft and submit to DPU for review and approval.
    • The DPU may reject a final report if it does not meet a high threshold of quality and completeness; upon rejection, DPU will require MBTA to submit a revised report.  The final report must be formally accepted by the DPU before an investigation is closed.  Many final reports also include recommendations for CAPs.
  • "CAPs" refers to Corrective Action Plans, which address deficiencies identified during investigations.  DPU may also require the creation of CAPs to address safety compliance issues we identify through our inspections and our audits.
    • Each Corrective Action Plan is made up of one or more Corrective Actions, each with specific due dates and items to address the safety issues identified.
  • Investigation Final Reports Past Due indicates that MBTA has not submitted a final report by the due date or has not submitted a revised report following a DPU rejection by the revision due date.  Count is accurate as of the last day of the reporting month.
  • Overdue Corrective Actions Percentage indicates the percentage of Corrective Actions that are open past the scheduled date of completion.  The percentage includes Corrective Actions with a pending MBTA request for modification or extension but does not include pending MBTA requests for closure. Percentage is accurate as of the last day of the reporting month.

Diversion Oversight

DPU Rail Transit Safety Division team members participate in oversight activities during diversion work across the MBTA system.  In November 2025, MBTA conducted diversions on the Red Line and the Green Line.  DPU observed construction work during both diversions and attended MBTA update meetings and construction safety briefings.

A large yellow and black construction vehicle works on the tracks.
MBTA personnel perform construction activities during the November 2025 Red Line diversion, as photographed by DPU.
MBTA personnel in yellow and orange safety vests operate a bucket truck.
MBTA personnel perform construction activities during the November 2025 Green Line diversion, as photographed by DPU.

Inspections Update

The DPU Rail Transit Safety Division is a national leader in inspections.  Inspections include our field activities, the "boots on the ground" oversight of the MBTA's operations.  These field activities include, but are not limited to:

MBTA employee in a yellow and orange vest measures streetcar speed using a LiDAR device on the platform.
An MBTA inspector measures Green Line streetcar speed using a LiDAR (Light Detection and Ranging) device as it approaches Kenmore Station in November 2025, as photographed by DPU.
  • Track walks
  • Power system checks
  • Personal Protective Equipment (“PPE”) and Right-Of-Way access card checks
  • Construction safety briefing reviews
  • Green Line speed audits using LiDAR
  • Headlight and door procedure checks
  • Station and carhouse/yard safety audits
  • Operation Control Center (“OCC”) review

Below are numbers highlighting our inspection work in November 2025 per line.  Note that some inspections don't occur at a specific station or line location.  Numbers are current as of the last day of the month and may be adjusted if data is updated post-submittal:

Questions or Comments?

If you have questions or comments about the Division's oversight work, you can send an email to dpu.rail@mass.gov.

Date published: December 1, 2025

Help Us Improve Mass.gov  with your feedback

Please do not include personal or contact information.
Feedback