Section 100: Earthwork, Grading, Demolition, Rodent Control and Borings
| Drawing number | Title | Current version | Previous version |
|---|---|---|---|
| 121.0.1 | Rock Cut Section | Jan 2025 | |
| 123.0.1 | Limit of Muck Excavation | Jun 2025 | 123.0.1 (Jan 2025) |
| 150.0.1 | Method of Rounding Slopes- Cut and Fill Slopes | Jan 2025 |
Section 200: Drainage
| Drawing number | Title | Current version | Previous version |
|---|---|---|---|
| 201.0.1 | Concrete Block Catch Basin | Jan 2025 | |
| 201.0.2 | Precast Concrete Catch Basin | Jun 2025 | 201.0.2 (Jan 2025) |
| 201.0.3 | Precast Concrete Catch Basin Tub | Jun 2025 | 201.0.3 (Jan 2025) |
| 202.0.1 | Concrete Block Manhole - Manholes 9' or Less in Depth | Jan 2025 | |
| 202.0.2 | Precast Concrete Manholes 9' or Less in Depth | Jan 2025 | |
| 202.2.1 | Concrete Block Manhole - Manholes Over 9' in Depth | Jan 2025 | |
| 203.0.1 | Special Manholes for 36" to 84" Diameter R.C. Pipe | Jan 2025 | |
| 204.0.1 | Gutter Inlet | Jan 2025 | |
| 205.0.1 | Dry Stone Masonry Leaching Basin | Jun 2025 | 205.0.1 (Jan 2025) |
| 205.0.2 | Concrete Block Leaching Basin | Jan 2025 | |
| 206.0.1 | Drop Inlets Type A - Precast Concrete Type B - Concrete Block | Jan 2025 | |
| 206.1.1 | Drop Inlets Type AF - Precast Concrete Type BF - Concrete Block | Jun 2025 | 206.1.1 (Jan 2025) |
| 208.0.1 | Drop Inlet Type C | Jun 2025 | 208.0.1 (Jan 2025) |
| 208.1.1 | Drop Inlet Type CF | Jan 2025 | |
| 208.1.2 | Flush Drop Inlet Throat | Jan 2025 | |
| 209.0.1 | Drop Inlet Type D | Jan 2025 | |
| 209.1.1 | Drop Inlet Type DF | Jan 2025 | |
| 221.0.1 | Manhole Frame and Cover - A Frame | Jan 2025 | |
| 221.0.2 | Manhole Frame and Cover - B Frame | Jan 2025 | |
| 221.0.3 | Manhole Cover Details | Jan 2025 | |
| 222.0.0 | Catch Basin Frame | Jan 2025 | |
| 222.0.1 | Hook Lock Bar Grate | Jan 2025 | |
| 222.0.2 | Frame and Hook Lock Bar Grate- Frame Assembly Details | Jun 2025 | 222.0.2 (Jan 2025) |
| 222.1.1 | Hook Lock Cascade Grate- Flow From Left | Jan 2025 | |
| 222.1.2 | Frame and Hook Lock Cascade Grate- Flow From the Left- Assembly Details | Jun 2025 | 222.1.2 (Jan 2025) |
| 222.1.3 | Hook Lock Cascade Grate- Flow From Right | Jan 2025 | |
| 222.1.4 | Frame and Hook Lock Cascade Grate- Flow From the Right- Assembly Details | Jun 2025 | 222.1.4 (Jan 2025) |
| 222.2.1 | Drop Inlet Grate | Jan 2025 | |
| 223.0.1 | Concrete Collars | Jan 2025 | |
| 224.0.1 | Catch Basin Hood | Jan 2025 | |
| 230.0.1 | Concrete and Field Stone Masonry Pipe Ends for 8" to 30" Pipe | Jun 2025 | 230.0.1 (Jan 2025) |
| 230.0.2 | Concrete and Fieldstone Masonry Pipe Ends for Combination Pipes up to 30" | Jan 2025 | |
| 230.0.3 | Concrete and Fieldstone Masonry Pipe Ends for 30" to 84" Pipe Culverts | Jan 2025 | |
| 230.1.1 | Corrugated Metal Pipe Under Fill Slope | Jun 2025 | 230.1.1 (Jan 2025) |
| 230.7.1 | Standard Metal End | Jan 2025 | |
| 232.0.1 | Half Circle CCM Pipe Waterways | Jan 2025 | |
| 242.0.1 | Reinforced Concrete Pipe Flared Ends | Jan 2025 | |
| 242.0.2 | Concrete Splash Pads | Jan 2025 | |
| 258.0.0 | Quantity Tables for Concrete and Field Stone Masonry Pipe Ends | Jan 2025 | |
| 258.0.1 | Stone Pipe Ends for Pipes 24" and Less in Diameter | Jan 2025 | 258.0.1 (Jan 2025) |
| 260.0.1 | Subdrain | Jan 2025 | |
| 280.0.1 | Paved Waterways and Apron | Jan 2025 | |
| 280.0.2 | Paved Waterways | Jan 2025 |
Section 400: Sub-Base, Base Courses, Shoulders, Pavements and Berms
Section 500: Curb and Edging
Section 600: Highway Guard, Fences and Walls
| Drawing number | Title | Current version | Previous version |
|---|---|---|---|
| 601.0.1 | General Notes | Jun 2025 | 601.0.1 (Jan 2025) |
| 601.0.2 | W-Beam & Thrie Beam Panel Details | Jun 2025 | 601.0.2 (Jan 2025) |
| 601.0.3 | Post & Offset Block Details | Jun 2025 | 601.0.3 (Jan 2025) |
| 601.0.4 | Special Post Designs | Jun 2025 | 601.0.4 (Jan 2025) |
| 601.0.5 | Guardrail Mounting Heights & Post Depths | Jun 2025 | 601.0.5 (Jan 2025) |
| 601.0.6 | Guardrail Sections | Jun 2025 | 601.0.6 (Jan 2025) |
| 620.12.1 | Guardrail, TL-2 | Jun 2025 | 620.12.1 (Jan 2025) |
| 620.13.1 | Guardrail, TL-3 | Jun 2025 | 620.13.1 (Jan 2025) |
| 627.0.1 | Approach Geometry: Single Faced | Jun 2025 | 627.0.1 (Jan 2025) |
| 627.0.2 | Approach Geometry: Adjacent to Curb & Double Faced | Jun 2025 | 627.0.2 (Jan 2025) |
| 627.1.1 | Trailing Anchorage | Jun 2025 | 627.1.1 (Jan 2025) |
| 627.1.2 | Trailing Anchorage Component Details | Jun 2025 | 627.1.2 (Jan 2025) |
| 628.0.1 | Layout to Single Faced Rigid Barrier or Bridge Rail | Jun 2025 | 628.0.1 (Jan 2025) |
| 628.0.2 | Layout to Double Faced Rigid Barrier - Trailing Ends | Jan 2025 | |
| 628.21.1 | Transition to NCHRP 350 Guardrail | Jun 2025 | 628.21.1 (Jan 2025) |
| 628.22.1 | Transition to Rigid Barrier (Single Faced) | Jun 2025 | 628.22.1 (Jan 2025) |
| 628.22.2 | Transition to Rigid Barrier Details | Jun 2025 | 628.22.2 (Jan 2025) |
| 628.23.1 | Transition to Rigid Barrier (Double Faced) | Jun 2025 | 628.23.1 (Jan 2025) |
| 628.24.1 | Transition to Bridge Rail (Back of Sidewalk) | Jan 2025 | |
| 628.24.2 | Transition to Bridge Rail (Face of Curb) | Jan 2025 | |
| 628.24.3 | Transition to Bridge Rail Details | Jan 2025 | |
| 644.0.1 | Chain Link Fence (Spring Tension Wire) | Jun 2025 | 644.0.1 (Jan 2025) |
| 644.0.2 | Chain Link Fence (Spring Tension Wire) | Jan 2025 | |
| 645.0.1 | Chain Link Fence (Pipe Top Rail) | Jun 2025 | 645.0.1 (Jan 2025) |
| 650.0.1 | Chain Link Fence Details of Cable Attachments & Post Bases | Jan 2025 | |
| 650.0.2 | Chain Link Fence Post Details | Jan 2025 | |
| 650.0.3 | Chain Link Fence - Swing Gate | Jan 2025 | |
| 650.0.4 | Chain Link Fence Cantilever Gate | Jan 2025 | |
| 685.0.1 | Cemented Stone Masonry Wall | Jan 2025 | |
| 697.0.1 | Ditch Check Dams for Erosion Control | Jan 2025 | |
| 697.0.2 | Hay Bales and Silt Fences for Erosion Control | Jan 2025 |
Section 700: Incidental Work
| Drawing number | Title | Current version | Previous version |
|---|---|---|---|
| 701.1.1 | Sidewalk Through Driveways Without Curb Returns 6' | Jan 2025 | |
| 701.1.2 | Sidewalk Through Driveways With Curb Returns 2' Curb Corners | Jan 2025 | |
| 701.1.3 | Residential Driveways | Jan 2025 | |
| 701.2.1 | Detectable Warning Panel for Wheelchair Ramps and Standard Ramp Terminology | Jan 2025 | |
| 701.2.2 | Pedestrian Curb Ramp in Constrained Condition with Detectable Warning Panels | Jan 2025 | |
| 701.2.3 | Pedestrian Curb Ramp Less Than 12'-4'' Sidewalk | Jan 2025 | |
| 701.2.4 | Pedestrian Curb Ramp Greater Than 12'-4'' Sidewalk | Jan 2025 | |
| 701.2.5 | Pedestrian Curb Ramp for One Continious Direction of Pedestrian Travel | Jan 2025 | |
| 701.2.6 | "T" Intersection Pedestrian Curb Ramp | Jan 2025 | |
| 701.2.7 | Pedestrian Curb Ramp with Width Less Than 12'-4'' | Jan 2025 | |
| 701.2.8 | Minimum Curb Transition Length for Pedestrian Curb Ramp | Jan 2025 | |
| 710.3.1 | Bound Lettered Granite | Jan 2025 | |
| 715.0.1 | Setting Rural Mailboxes | Jan 2025 |
Section 800: Traffic Control Devices
Subsection 815: Traffic Control Signals
Subsection 825: Rectangular Rapid Flashing Beacons
Subsection 828: Traffic Signs
Subsection 836: Station and Project Markers
| Drawing number | Title | Current version | Previous version |
|---|---|---|---|
| 836.0.1 | Demountable Reflectorized Station Marker and Project Marker | Jan 2025 |
Subsection 850: Traffic Controls for Construction and Maintenance Operations
| Drawing number | Title | Current version | Previous version |
|---|---|---|---|
| 850.1.1 | Temporary Curb Ramp (1 of 2) | Jan 2025 | |
| 850.1.2 | Temporary Curb Ramp (2 of 2) | Jan 2025 | |
| 851.1.1 | Cones & Drums | Jan 2025 | |
| 851.2.1 | Type III Barricade | Jan 2025 | |
| 851.2.2 | Type III Barricade with Sign | Jan 2025 | |
| 851.3.1 | Pedestrian Channelizing Device | Jan 2025 | |
| 852.1.1 | Sidewalk Detour | Jan 2025 | |
| 852.1.2 | Sidewalk Diversion | Jan 2025 | |
| 852.1.3 | Pedestrian Detour for Crosswalk Closure | Jan 2025 | |
| 852.2.1 | Off-Road Shared Use Path Detour | Jan 2025 | |
| 852.2.2 | On-Road Shared Use Path Diversion | Jan 2025 | |
| 852.3.1 | Bicycle Lane Closure | Jan 2025 | |
| 852.3.2 | Bicycle Lane Closure with On-Road Detour | Jan 2025 | |
| 852.3.3 | Bicycle Lane Closure with Off-Road Detour | Jan 2025 | |
| 852.4.1 | Alternating One-Way (Flagger Control) | Jan 2025 | |
| 852.4.2 | Alternating One-Way (Automated Flagger Assistance Device) | Jan 2025 | |
| 852.4.3 | Alternating One-Way (Temporary Signal) | Jan 2025 | |
| 852.4.4 | Alternating One-Way (Traffic Officer) | Jan 2025 | |
| 852.5.1 | Two Lane Road Center of Road Closure | Jan 2025 | |
| 852.5.2 | Two Lane Road Half of Road Closure with Drop-Off Protection | Jan 2025 | |
| 852.5.3 | Two Lane Road Shoulder Closure | Jan 2025 | |
| 852.5.4 | Two Lane Road Half Road Closure | Jan 2025 | |
| 852.5.5 | Two Lane Road Center of Road Closure with Drop-Off Protection | Jan 2025 | |
| 852.6.1 | Multi-Lane Road Right Lane Closure | Jan 2025 | |
| 852.6.2 | Multi-Lane Road Right Lane Closure (Unbalanced Traffic) | Jan 2025 | |
| 852.6.3 | Multi-Lane Road Left Lane Closure | Jan 2025 | |
| 852.6.4 | Multi-Lane Road Half Road Closure | Jan 2025 | |
| 852.6.5 | Multi-Lane Road Interior Lanes Closure | Jan 2025 | |
| 852.6.6 | Multi-Lane Road Two-Way Center Turn Lane Closure | Jan 2025 | |
| 852.7.1 | Divided Highway Right Shoulder Closure (Short Term) | Jan 2025 | |
| 852.7.2 | Divided Highway Left Shoulder Closure (Short Term) | Jan 2025 | |
| 852.7.3 | Divided Highway Right Lane Closure (Short Term) | Jan 2025 | |
| 852.7.4 | Divided Highway Left Lane Closure (Short Term) | Jan 2025 | |
| 852.7.5 | Divided Highway Right Lane Closure (Intermediate & Long-Term) | Jan 2025 | |
| 852.7.6 | Divided Highway Left Lane Closure (Intermediate & Long-Term) | Jan 2025 | |
| 852.7.7 | Divided Highway Center Lane Closure (Short Term) | Jan 2025 | |
| 852.7.8 | Divided Highway Right Two Lanes Closure (Short Term) | Jan 2025 | |
| 852.7.9 | Divided Highway Left Two Lanes Closure (Short Term) | Jan 2025 | |
| 852.7.10 | Divided Highway Multiple Lane Shift | Jan 2025 | |
| 852.7.11 | Divided Highway Scarified Pavement/Steel Plate | Jan 2025 | |
| 852.8.1 | Exit Ramp Right Side of Ramp Closure | Jan 2025 | |
| 852.8.2 | Exit Ramp Left Side of Ramp Closure | Jan 2025 | |
| 852.8.3 | Exit Ramp Typical Closure | Jan 2025 | |
| 852.8.4 | Exit Ramp Typical Cloverleaf Closure | Jan 2025 | |
| 852.8.5 | Exit Ramp Work Within Vicinity of Ramp (Departure Side) | Jan 2025 | |
| 852.8.6 | Exit Ramp Work Within Vicinity of Ramp (Approach Side) | Jan 2025 | |
| 852.9.1 | Entrance Ramp Partial Closure | Jan 2025 | |
| 852.9.2 | Entrance Ramp Work Within Vicinity of Ramp | Jan 2025 | |
| 852.9.3 | Entrance Ramp Work Downstream | Jan 2025 | |
| 852.10.1 | Intersection Center Closure | Jan 2025 | |
| 852.10.2 | Intersection Quadrant Closure | Jan 2025 | |
| 852.10.3 | Intersection Far Side Inside Lane Closure | Jan 2025 | |
| 852.10.4 | Intersection Far Side Right Lane Closure | Jan 2025 | |
| 852.10.5 | Intersection Half Road Closure | Jan 2025 | |
| 852.10.6 | Intersection Multi-Lane Closure (Low Speed) | Jan 2025 | |
| 852.10.7 | Intersection Multi-Lane Closure (High Speed) | Jan 2025 | |
| 852.10.8 | Intersection Center Lane Closure | Jan 2025 | |
| 852.10.9 | Work Near Railroad Crossing | Jan 2025 | |
| 853.2.1 | Temporary Concrete Barrier MASH TL-2 1/3 | Jun 2025 | 853.2.1 (Jan 2025) |
| 853.2.2 | Temporary Concrete Barrier MASH TL-2 2/3 | Jun 2025 | 853.2.2 (Jan 2025) |
| 853.2.3 | Temporary Concrete Barrier MASH TL-2 3/3 | Jun 2025 | 853.2.3 (Jan 2025) |
| 853.23.0 | Temporary Concrete Barrier Retrofitted to MASH TL-3 | Jun 2025 | 853.23.0 (Jan 2025) |
| 853.23.1 | Temporary Concrete Barrier Retrofitted to MASH TL-3 1/2 | Jun 2025 | 853.23.1 (Jan 2025) |
| 853.23.2 | Temporary Concrete Barrier Retrofitted to MASH TL-3 2/2 | Jun 2025 | 853.23.2 (Jan 2025) |
Section 900: Structures
| Drawing number | Title | Current version | Previous version |
|---|---|---|---|
| 901.5.1 | Cement Concrete Steps 1/2 | Jun 2025 | 901.5.1 (Jan 2025) |
| 901.5.2 | Cement Concrete Steps 2/2 | Jan 2025 | |
| 987.3.1 | Special Slope Paving Under Bridges Reinforced Concrete Slab | Jan 2025 | |
| 987.3.2 | Special Slope Paving Under Bridges Reinforced Concrete Slab Details | Jan 2025 |
Change Log for Construction Standard Detail Drawings
-
Open XLSX file, 24.38 KB, Change log for Construction Standard Detail Drawings updated June 2025 (English, XLSX 24.38 KB)
Superseded construction standard detail versions
-
Open PDF file, 14.61 MB, 2017 Construction Standard Details (English, PDF 14.61 MB)
-
Open PDF file, 24.17 MB, 2016 Construction Standard Details (English, PDF 24.17 MB)
-
Open PDF file, 118.4 KB, 2012 Construction Standard Details: Drawing History Index (English, PDF 118.4 KB)
-
Open PDF file, 27.26 MB, 2012 Construction Standard Details (English, PDF 27.26 MB)
-
Open PDF file, 13.87 MB, 2010 Construction Standard Details (English Edition) (English, PDF 13.87 MB)
-
Open PDF file, 14.61 MB, 2017 Construction Standard Details (English, PDF 14.61 MB)
-
Open PDF file, 5.59 MB, 2003 Metric/English Supplemental Drawings (English, PDF 5.59 MB)
-
Open PDF file, 7.69 MB, 1996 Construction and Traffic Standard Details (Metric Edition) (English, PDF 7.69 MB)
-
Open PDF file, 3.1 MB, 1966 Construction Standards 1st Edition (Obsolete) (English, PDF 3.1 MB)
-
Open PDF file, 4.81 MB, Traffic Management Plans and Detail Drawings (English, PDF 4.81 MB)
Other active standards
-
Open PDF file, 6.89 MB, MassDOT Standard Drawings for Signs and Supports (English, PDF 6.89 MB)
-
Open PDF file, 3.28 MB, Overhead Signal Structure & Foundation Standard Drawings (English, PDF 3.28 MB)
-
Open PDF file, 3.26 MB, Standard Drawings for Traffic Signals and Highway Lighting (English, PDF 3.26 MB)