Berkshires & Hilltowns
-
Adams
-
Adams & Mohawk Trail Woodlands Partnership - Mohawk Trail Woodland Partnership Regional Adaptation & Resilience Project (FY20)
-
Assessment and Conceptual Design for Adaptation and Resiliency (FY18)
-
-
Ashfield
-
Baptist Corner Road Stream Crossing Ecological Improvements (FY22)
-
-
Blandford
-
Resilient Community-Driven Master Plan + Resilient Regulatory Work (FY21)
-
-
Buckland
-
Watershed-Based Assessment and Climate Resiliency Plan for Clesson Brook (FY22)
-
-
Great Barrington
-
Climate Action, Resilience, and Equity (FY21)
-
-
Lenox
-
Housatonic Stream Restoration for Regional Flood Resilience Project (FY22)
-
-
Monterey
-
Replacement of Main Road Culvert over Konkapot River (FY20)
-
-
Pittsfield
-
Mill Street Dam Removal Project (FY20)
-
Churchill Brook and West Street Culvert Replacement Project (FY19)
-
-
Plainfield
-
Plainfield Culvert Assessment (FY20)
-
-
Sheffield
-
Rural Dirt Road Resilience (FY20)
-
-
Stockbridge
-
Stockbridge Resilient Housing Initiative (FY21)
-
-
Westhampton
-
Resilience Building through Community Visioning and Planning (FY22)
-
-
Williamstown
-
Mohawk Trail Woodland Partnership Forest Stewardship, Resilience & Climate Adaptation (FY21)
-
Greater Connecticut River Valley
-
Agawam
-
Agawam Stormwater Master Plan (FY21)
-
-
Amherst
-
Amherst Climate Action, Adaptation and Resilience Plan (FY20)
-
-
Athol
-
Greening Lord Plaza Phase 2 (FY22)
-
Athol & North Quabbin Community Coalition - Lord Pond Plaza Improvement Project (FY21)
-
-
Belchertown
-
Land Conservation and Restoration of the Scarborough Brook Headwaters for Climate Resilience (FY22)
-
Enhancing Water Supply Reliability: Resilient Water Storage and Water Conservation - Design & Implementation (FY21)
-
Enhancing Water Supply Reliability: Resilient Water Storage and Water Conservation Planning (FY19)
-
Town-Wide Road Stream Crossing Assessment and Climate Change Adaptation Plan (FY18)
-
-
Deerfield
-
Healthy Soils, Green Infrastructure Policy and Climate Resiliency Public Engagement in Deerfield (FY22)
-
Flood Resiliency Through Green Infrastructure (FY20)
-
Reducing Flooding Vulnerability in Deerfield (FY19)
-
Culvert Redesign and Retrofit and Bylaw Update (FY18)
-
-
East Longmeadow
-
Comprehensive Master Plan (FY21)
-
-
Easthampton
-
Emerald Place Resiliency (FY23)
-
Green Infrastructure Planning and Resiliency Design for Cherry Street (FY21)
-
-
Erving
-
Wheelock Culvert Repair Replacement and Data Redundancy (FY20)
-
-
Granby
-
Resilient Regulatory Work + Refocusing on Climate Resilience Pathway in Master Plan (FY21)
-
-
Hampden
-
Hampden/East Longmeadow Infrastructure Assessment and Prioritization of Nature-Based Solutions and Public Outreach and Participation (FY22)
-
-
Holyoke
-
Urban Forest Equity Plan (FY21)
-
Impervious Surface Mapping for Resiliency Planning and Implementation (FY20)
-
The City of Holyoke's Response to Climate Change Displacement (FY18)
-
-
Leverett
-
Shutesbury Road Culvert Enhancement (FY22)
-
-
Monson
-
Chicopee Brook Flood Resilience Improvements (FY23)
-
Energy Resilience for Town Hall-EOC-Police HQ Facility (FY20)
-
-
Montague
-
City Road Flooding Protection Project- Design and Permitting (FY18)
-
-
Northampton
-
Restoring the Pine Grove Golf Course for Climate Resiliency (FY20)
-
Protecting Downtown: Northampton's Flood Control Levees (FY19)
-
Nature-Based Flood Protection to Reduce Vulnerabilities (FY18)
-
-
Palmer
-
RT 181 Culvert Replacement Permitting & Final Design (FY20)
-
Comprehensive Master Plan (FY20)
-
-
Pelham
-
Severe Weather Mitigation Project (FY20)
-
Resilient Pelham (FY18)
-
-
South Hadley
-
Queensville Dam Removal Feasibility Study and Buttery Brook Watershed Enhancement (FY22)
-
Climate Resilient South Hadley (FY21)
-
-
Southwick
-
Klaus Anderson Road/Johnson Brook Replacement Culvert and Green Infrastructure (FY22)
-
Klaus Anderon Road Culvert Design (FY19)
-
-
Springfield
-
People-focused Resilient Redesign and Retrofits for community/civic Infrastructure and critical facilities in Springfield MA (improving communication/ building trust and advancing Microgrids) (FY21)
-
Community Resilience through Urban Forestry (FY19)
-
Central
-
Auburn
-
Leesville Pond Water Quality Protection and Community-Wide Resiliency Improvements (FY21)
-
Develop Protection Measures for Vulnerable Drinking Water Supply Areas and Evaluate Green Bridge Design (FY20)
-
-
Ayer
-
Ayer-Devens Main Streets Regional Pocket Forests Pilot Project (FY23)
-
-
Berlin
-
Horseshoe Pond Acquisition Project (FY23)
-
-
Bolton
-
Nashua River Communities Resilient Lands Management Project (FY22)
-
Apple Country Ecological Climate Resiliency and Carbon Planning and Assessment Project (FY21)
-
-
Charlton & Spencer
-
Integrated Water Infrastructure Vulnerability Assessment and Climate Resiliency Plan (FY18)
-
-
Devens
-
Climate Action & Resilience Plan (FY19)
-
-
Fitchburg
-
Generating Resiliency in Downtown Fitchburg with Nature-Based Solutions (FY23)
-
Bolstering Public and Private Action to Improve Flood Resilience in Baker Brook (FY22)
-
John Fitch Highway - A Resilient Road Corridor (FY21)
-
-
Harvard
-
Community Climate Action and Land Stewardship Plan: Achieving an Agrarian Sustainability (FY20)
-
-
Holden
-
Water-Sewer Infrastructure Green Emergency Power Study (FY18)
-
-
Leominster
-
Monoosnoc Brook Bank Stabilization Project (FY21)
-
-
Mendon
-
Mendon Town Hall Campus Green Stormwater Infrastructure: Design through Contractor Mobilization (FY22)
-
Integration of Low Impact Development Standards into Local Bylaws and Subdivision Regulations (FY18)
-
-
Milford
-
Green Stormwater Infrastructure in Milford Town Park (FY21)
-
-
Millbury
-
Armory Village Green Infrastructure Project - Phase II (FY21)
-
Armory Village Green Infrastructure Project (FY19)
-
-
Northbridge
-
Carpenter Road Causeway Alternatives Analysis and Source Water Green Infrastructure Protection Plan (FY22)
-
-
Shirley
-
Microgrid Feasibility (FY20)
-
-
Shrewsbury
-
Climate Action and Resilience Plan (FY23)
-
Regulatory Update for Sustainable Parking Requirements (FY23)
-
-
Southborough
-
Planimetric Impervious Surface Mapping Project (FY22)
-
-
Spencer
-
Green Infrastructure Implementation in Downtown Spencer, Mechanic Street Parking Lot (FY19)
-
-
Sutton
-
Manchaug Village Water Resource Resiliency Action Plan (FY22)
-
-
Uxbridge
-
Home Brew Dam and Whitin Pond Dam Removal (FY23)
-
Integrated Vector-Borne Disease Control Program (FY20)
-
Integrated Water Infrastructure Vulnerability Assessment and Climate Resiliency Plan (FY19)
-
-
Worcester
-
Worcester Senior Center Parking Lot - Nature-Based Solutions (FY20)
-
Northeast
-
Acton
-
Climate Action Plan and Electrification Roadmap (FY22)
-
53 River Street Dam Removal (FY20)
-
-
Amesbury
-
Open Space and Recreation Plan Update (FY20)
-
-
Andover
-
Shawsheen River Watershed Land Conservation Planning and Prioritization for Climate Resilience and Environmental Justice (FY23)
-
Shawsheen River Watershed Land Conservation Planning and Prioritization for Climate Resilience and Environmental Justice (FY22)
-
-
Beverly
-
Bass River District Resilience Plan (FY23)
-
Beverly and Salem Climate Action and Resilience Plan (FY20)
-
-
Boxford, Topsfield, & Ipswich
-
Increasing Regional Flood Resiliency Through Re-Designing Culverts in The Howlett Brook Watershed (FY20)
-
-
Burlington
-
Vine Brook Watershed and Urban Heat Island Assessment (FY22)
-
-
Chelmsford
-
Dunshire Drive Culvert Replacement & Deep Brook Stream Restoration: Phase I (FY20)
-
-
Concord
-
Reforestation and Municipal Tree Resilience (FY19)
-
Climate Action and Resilience Plan (FY19)
-
-
Essex
-
Impacts of future storminess, greater wave energy, and increased sediment transportation along Castle Neck into Essex Bay (FY19)
-
Living Shoreline Feasibility Study for Essex Bay (FY18)
-
-
Essex, Ipswich, & Newbury
-
Assessing Marsh Management Techniques After Natural Sediment Accretion Event (FY18)
-
-
Gloucester
-
Gloucester Climate Action and Resilience Plan (CARP) (FY22)
-
Watershed and Water Supply Vulnerability, Risk Assessment and Management Strategy (FY18)
-
-
Groveland
-
Johnson Creek Watershed Flood Resiliency Project (FY22)
-
-
Haverhill
-
Little Dam Removal and River Restoration (FY22)
-
Little River Dam Removal Feasibility Study (FY21)
-
-
Ipswich
-
Ipswich River Sewer Interceptor Bank Bio-stabilization Project (FY22)
-
Ipswich River Sewer Interceptor and Siphon Risk Mitigation and Resiliency Improvements Design (FY20)
-
-
Lawrence
-
Flood Study and DPW Yard Adaptation Plan (FY21)
-
-
Lincoln
-
Town of Lincoln Comprehensive Climate Action Plan (L-CAP) Proposal (FY23)
-
-
Littleton
-
Watershed Projection for Climate Resiliency - Brown's Woods Acquisition (FY21)
-
-
Lowell
-
Claypit Brook Climate Resilience Stormwater Management Capital Improvement Plan (FY21)
-
-
Lynn
-
Barry Park Green Infrastructure Project (FY22)
-
Strawberry Brook Green Infrastructure Implementation (21)
-
Strawberry Brook Watershed Flood Relief (FY20)
-
-
Lynnfield
-
Richardson Green Conservation Acquisition (FY22)
-
-
Manchester-by-the-Sea
-
Sawmill Brook Central Pond Restoration Project Phase 2: Permitting and Final Design (FY20)
-
Permitting and Design for Ecological Restoration and Habitat Management to Increase Resiliency (FY18)
-
-
Methuen
-
Searles Pond/Bloody Brook Corridor Resilience Planning (FY22)
-
-
Nahant
-
Increasing the Resiliency of Short Beach on Nahant to Sea Level Rise: Access Point Restoration and Modification Plan (FY20)
-
-
Newbury & Newburyport
-
Plum Island: Exploring the Fiscal and Economic Implications of Sea Level Rise (FY20)
-
-
Newbury
-
Controlling Flood and Addressing Future Climate Impacts Through the Replacement of the Orchard Street Culvert (FY20)
-
Assessing Storm Energy Reduction by the Vegetated Salt Marsh Platform (FY18)
-
-
Newburyport
-
Resilient Critical Infrastructure: Adapting a Wastewater Treatment Facility, Underground Electric Lines and Public Rail Trail to Future Sea Level Rise and Storm Surge (FY21)
-
Resilient Critical Infrastructure: Adapting a Wastewater Treatment Facility, Underground Electric Lines, and Public Rail Trail to Future Sea Level Rise and Storm Surge Part 1 (FY20)
-
Wastewater Treatment Plant Climate Resilience (FY18)
-
-
Peabody
-
Resilient North River Canal Corridor Phase 2 (FY20)
-
Lawrence Brook Watershed Risk Assessment (FY18)
-
Improving Flood Resiliency of North River Canal in Peabody (FY18)
-
-
Pepperell
-
Sucker Brook Continuity Restoration (FY22)
-
-
Salem
-
Ocean Ave. West Pump Station Flood Mitigation (FY20)
-
Green Infrastructure for Stormwater Management in City Projects (FY19)
-
Sanitary Sewer Trunk Line Relocation Assessment (FY18)
-
-
Salisbury
-
Resilient Ring’s Island: Preventing a Neighborhood from Being Stranded by Flooding (FY21)
-
Resilient Ring’s Island: Preventing a Neighborhood from Being Stranded by Flooding (FY19)
-
-
Saugus
-
Saugus Climate Adaptation and Resilience Plan (FY22)
-
-
Stow & Hudson
-
Assessing the Health of Lake Boon - a Key to Climate Resiliency in Stow & Hudson, MA - and beyond (FY21)
-
-
Swampscott
-
Beach Access Resiliency and Accessibility Improvements (FY20)
-
-
Tewksbury
-
Stormwater Analysis for Nature-Based Solutions and Community Co-Benefits (FY22)
-
-
Westford
-
Westford Tree and Invasive Species Inventory and Management Plan with Tree Planting Plan (FY23)
-
-
Woburn
-
Shaker Glen Extension Restoration and Flood Mitigation (FY20)
-
Horn Pond Brook Improved Fisheries Habitat and Flood Control (FY19)
-
Greater Boston
-
Arlington
-
Wicked Hot Mystic (FY21)
-
Mill Brook Corridor Flood Management Demonstration Project (FY18)
-
-
Belmont
-
Stormwater Flood Reduction and Climate Resilience Capital Improvement Plan (FY20)
-
-
Boston
-
Heat Resilience Planning Study (FY21)
-
Moakley Park - Resilience Preliminary Design, Technical Analysis, and Pre-Permitting (FY19)
-
Climate Ready Zoning and Design Guidelines (FY18)
-
-
Braintree
-
Smith Beach Green Infrastructure Project (FY22)
-
Armstrong Dam and Ames Pond Dam Removal Final Design and Permitting (FY19)
-
-
Brockton
-
Integrated Water Infrastructure Vulnerability Assessment for Climate Resiliency (FY19)
- Case Study
- Nature-Based Solutions for Flood Resiliency: Salisbury Brook & Salisbury Plain River Final Report
- Nature-Based Solutions for Flood Resiliency: Salisbury Brook & Salisbury Plain River Final Report Appendices
- Nature-Based Solutions for Flood Resiliency: Trout Brook Final Report
- Executive Summary (English)
- Executive Summary (Cape Verdean Creole)
- Executive Summary (Haitian Creole)
- Executive Summary (Spanish)
-
-
Brookline
-
Urban Forestry Climate Resiliency Master Plan (FY20)
-
Climate Resiliency Policy Audit-Amendments and LID and Design Guidelines (FY18)
-
-
Cambridge & Metro Mayors
-
Building Resilience to Climate Driven Heat in Metro Boston (FY21)
-
-
Cambridge
-
Completing a watershed-wide analysis to optimize and coordination regional stormwater management in the Mystic River Watershed (FY19)
-
Climate Change Preparedness & Resilience Catalyst Project (FY18)
-
-
Canton
-
Climate Change Vulnerability and Resiliency Assessment Study (FY20)
-
-
Chelsea
-
Urban Heat Island Mitigation Project (FY21)
-
-
Chelsea & Everett
-
Island End River Flood Resilience Project (FY20)
-
-
Dedham
-
Neponset Watershed Regional Adaptation Strategy and Flood Model (FY23)
-
Dedham Climate Action & Resiliency Plan (FY19)
-
-
Easton
-
Wetland Restoration - Removal of Abandoned Structures (FY20)
-
-
Everett
-
Island End River Flood Resilience Project (FY22)
-
-
Foxborough
-
Advancing Green Infrastructure in Foxborough for Enhancing Climate Resilience through Planning and Design (FY22)
-
-
Framingham
-
Walnut Street Neighborhood Flood Mitigation - Permits & Easements (FY23)
-
Walnut Street Neighborhood Flood Mitigation - Design & Permitting (FY22)
-
Walnut Street Neighborhood Flood Mitigation & City Stormwater Utility Feasibility Studies (FY20)
-
-
Hull
-
Assessment of Shoreline Resiliency Alternatives for Marginal Road (FY20)
-
-
Lexington
-
Upper Mystic River Regional Stormwater Wetlands (FY21)
-
-
Malden
-
Malden River Works for Waterfront Equity and Resilience (FY22)
-
Malden River Works (FY21)
-
-
Medford
-
Conceptualization and Community Building for Equitable, Community-Driven Resilience Hubs in Medford (FY21)
-
Equity-Centered Process for Climate Action and Adaptation Planning (FY20)
-
Suitability Assessment for Equitable, Community-Driven Resilience Hubs in Medford (FY20)
- Case Study
- Project Summary Presentation
- Final Report: Resilient Medford Resilience Hubs (English)
- Final Report: Resilient Medford Resilience Hubs (Arabic)
- Final Report: Resilient Medford Resilience Hubs (Creole)
- Final Report: Resilient Medford Resilience Hubs (Portuguese)
- Final Report: Resilient Medford Resilience Hubs (Spanish)
- Final Report: Resilient Medford Resilience Hubs (Vietnamese)
-
Flood Mitigation Strategy Feasibility Analysis and Conceptual Design (FY19)
-
Drainage Model and Conceptual Strategies to Reduce Future Flooding in South Medford (FY18)
-
Open Space Plan Update (FY18)
-
-
Melrose
-
Melrose, Malden, and Medford Building Resilience Efficiency, and Affordability Project (FY22 - 23)
-
Working Across Boundaries to Minimizing Stormwater Flood Damage in the Upper Mystic Watershed (FY22)
-
City Hall Parking Lot Green Infrastructure Project (FY20)
-
-
Millis
-
Flood Resiliency Plan (FY22)
-
-
Natick
-
Building Relationships and Resilience with MetroWest Environmental Justice Neighborhoods (22-23)
-
Building Resilience across the Charles River Watershed Phase II (FY22)
-
Building Resilience across the Charles River Watershed (FY21)
-
Tree Planting Plan to Mitigate Heat Islands and Reduce Runoff (FY18)
-
Water Conservation Campaign (FY18)
-
Low Impact Development Regulation Development and Zoning Bylaw Inclusion (FY18)
-
-
Norwood
-
Traphole Brook Flood Prevention and Stream Restoration Project (FY22)
-
-
Quincy
-
Coastal Flood Mitigation Storm Drainage Improvements - Phase I: Engineering & Public Outreach (FY20)
-
-
Revere
-
Regional Saugus River Watershed Vulnerability and Adaptation Study (FY23)
-
Gibson Park Resiliency Design and Permitting (FY22)
-
Coastal Resilience Feasibility Study for the Point of Pines and Riverside Area (FY21)
-
-
Scituate & Cohasset
-
Mapping Storm Tide Pathways in Scituate and Cohasset: Assessing Coastal Vulnerability to Storms and Sea Level Rise (FY19)
-
-
Scituate
-
Comprehensive Wastewater Treatment Resilience Feasibility Study (FY18)
-
-
Sherborn
-
Sherborn's Climate Activation and Resilience Plan- A Model for Climate Mobilization for the MetroWest Region (FY23)
-
-
Somerville
-
Critical Regional Infrastructure and Social Vulnerability in the Lower Mystic Watershed (FY20)
-
Detailed Vulnerability and Risk Assessment, Green Infrastructure, Public Education and Communication (FY18)
- Communication Materials Memorandum
- Green Stormwater Infrastructure Feasibility Study
- Green Stormwater Infrastructure Flooding and Water Quality Benefits Analyses
- Green Stormwater Infrastructure Planning & Guidance Document
- Stormwater System Modeling for Improved Communications and Development of Green Infrastructure (part 1 of 4)
- Stormwater System Modeling for Improved Communications and Development of Green Infrastructure (part 2 of 4)
- Stormwater System Modeling for Improved Communications and Development of Green Infrastructure (part 3 of 4)
- Stormwater System Modeling for Improved Communications and Development of Green Infrastructure (part 4 of 4)
-
-
Walpole
-
Culvert Assessment and Green Infrastructure Survey (FY19)
-
-
Waltham
-
Designing a Resilient Chester Brook Corridor (FY23)
-
Bringing Climate Resilience to Beaver Brook (FY22-23)
-
Resilient Stormwater Action and Implementation Plan (FY20-21)
-
-
Watertown
-
Equity-Based Community Greening Program (FY22)
-
-
Weston
-
Weston Ahead Climate Action and Resiliency Plan (FY20-21)
-
-
Weymouth
-
Fort Point Road Coastal Infrastructure Resilience Project (FY18)
-
-
Winthrop
-
Belle Isle Marsh: Evaluating Nature Based Solutions to Protect Abutting Communities and Critical Shorebird Habitat from Coastal Inundation (FY22)
-
Climate Resilient Land Use and Zoning (FY19)
-
-
Winthrop
-
Ingleside Park Feasibility Study and Permitting (FY18)
-
-
Wrentham
-
Eagle Dam Removal Phase II (FY23)
-
Climate Resilience and Low Impact Development Regulatory Integration and Green Infrastructure Master Plan (FY22)
-
Eagle Dam Removal (FY19)
-
Southeast
-
Carver
-
Climate Change Water Resource Vulnerability and Adaptation Strategy Assessment (FY18)
-
-
Dennis
-
Pound Pond, Dennis: Flood Mitigation and Storm Drainage Improvements (FY22)
-
-
Duxbury
-
Duxbury Climate Change Vulnerability Assessment and Adaptation Plan (FY19)
-
-
Edgartown
-
Edgartown Climate Change Vulnerability Assessment and Adaptation Plan (FY19)
-
-
Fairhaven
-
Climate Change Vulnerability Assessment (FY23)
-
-
Fall River
-
South Watuppa Pond Green Infrastructure Blue Water Restoration (FY23)
-
Water Supply Risk & Resilience Assessment and Distribution System Hydraulic Model Update (FY20)
-
Regional Interconnection Evaluation (FY21)
-
-
Falmouth
-
Conceptual Design of Flood-Resiliency Improvements for Sewer Infrastructure (FY22)
-
Coonamessett River Restoration Project: Construction of Phase 2 (FY19)
-
Coastal Resiliency Planning for the Surf Drive Area (FY19)
-
-
Gosnold
-
Cuttyhunk Land Conservation Project (FY20)
-
-
Lakeville, Middleborough, Freetown, Rochester, Taunton, & New Bedford
-
Assawompset Pond Complex Watershed Management and Climate Action Plan (FY21)
-
-
Marshfield
-
Long-term Coastal Resiliency Plan (FY22)
-
-
Mashpee
-
Watershed-based Solutions to Increase Resilience to Harmful Algal Blooms in Santuit Pond in a Warmer and Wetter Climate (FY22)
-
-
Mattapoisett
-
Pine Island Pond Watershed Lands (PIPWL) Project (FY19)
-
-
Nantucket
-
Resilient Nantucket: Designed for Adaptation (FY20)
-
-
New Bedford
-
New Bedford Green Infrastructure Master Strategy and Implementation Roadmap (FY22-23)
-
New Bedford Harbor MC-FRM Evaluation and Resilience Design Guideline Development (FY20)
-
Comprehensive Climate Adaptation and Resilience Action Plan and Interactive Community Dashboard (FY18)
-
-
Oak Bluff
-
Vulnerability Assessment and Permit Level Design of Coastal Resilience Improvements for Dukes County Ave Pump Station (FY23)
-
North Bluff Preservation Project (FY19)
-
-
Oak Bluffs, Aquinnah, Chilmark, Edgartown, Gosnold, Tisbury & West Tisbury
-
Martha's Vineyard and Gosnold Climate Action Plan, Phase II (FY22)
-
Development of an Island-wide Specific Adaptation Strategy (FY20)
-
-
Plymouth
-
Subterranean Resiliency: Predicting, Assessing and Mitigating Saltwater Intrusion (FY22)
-
-
Plympton
-
Building a Municipal Resilience Portfolio: Assessment of Critical Land in the Winnetuxet Corridor in Plympton (FY21)
-
-
Provincetown
-
Permit Level Design of the Ryder Street Outfall Relocation and Drainage Improvements (FY21)
-
-
Rehoboth
-
Culvert and Green Infrastructure Concept Design and Dam Resiliency Assessment (FY19)
-
-
Sandwich
-
Dynamic Adaptation Pathways and Prioritized Resilient Design Solutions for Historic Sandwich Village (FY22)
-
Communicating the Local Benefits of a Resilient Coast (FY19)
-
Climate Change Vulnerability Assessment-Adaptation Planning (FY18)
-
-
Swansea
-
Public Water Supply Infrastructure Vulnerability Assessment (FY18)
-
-
Wareham
-
Climate Change Flood Vulnerability Assessment-Adaptation Planning (FY18)
-
-
Wellfleet
-
Regional Low-Lying Road Assessment and Feasibility (FY22-23)
-
Herring River Restoration Project Phase 1 Final Construction Plans and Bid Specifications (FY22)
-
-
Westport
-
Assess and Plan for Climate Threats to East Beach Corridor (FY19)
-
-
Yarmouth
-
Climate Change Vulnerability Assessment and Adaptation Plan (FY23)
-
Yarmouth Clean Energy Resiliency for Regional Septic Processing & Transfer Station (FY20)
-